Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas online more than a week ago
Candidate
Male, 32 years, born on 26 September 1992
Not looking for a job
Aktau, willing to relocate (Aksay (Kazakhstan), Astana, Atyrau), prepared for business trips
The approximate area of the job search is specified
Civil engineer/CSA supervisor
Specializations:
- Other
Employment: full time, project work
Work schedule: full day
Work experience 10 years 11 months
January 2024 — currently
1 year 4 months
GmbH Dunga Operating
Civil & Structural Supervisor
- Compression Package.
- Construction of F and H lines (18 wells with lengths of pipeline 8320 m.)
June 2022 — January 2024
1 year 8 months
TOTAL Energies
Mangistau
Construction, Real Estate, Architecture... Show more
Civil & Structural Supervisor
Responsible for following project on civil and structural disciplines:
DP3 Facilities (Dunga Phase 3) Project, including:
- HP/LP Flare System
- Local Equipment Room
- Chemical Injection Skids Installation
- P-205C pump and debottlenecking
- Produced Water Recycle and Sand management
- Instrument Air and Nitrogen Utilities
- Construction of N and O lines (32 wells with lengths of pipeline 28630 m.)
May 2021 — June 2022
1 year 2 months
TCO (Tengiz Chevron Oil) via Kentech
Atyrau
CSA Supervisor
CSA SUPERVISOR (Civil, structural and architectural)
TCO (Tengiz Chevron Oil) via Kent LLP.
TCO Orken Village Project and IOCC stage 1.
May 2021 – July 2022
Integrated Operations Control Centre (IOCC), Orken Complex (OC), Site Facilities (SF)
Reporting to Construction Manager, responsible for the following scopes:
• Final construction phase of new Integrated Operations Control Centre (IOCC) for Tengiz plants (3GP, 3GI, SGP, SGI, KTL Units and Field Operations). Working with Business Partner to achieve overall Completion milestones for architectural fit-out in all areas
• Orken Utilities Data Centre (OUDC), including Joint Security and Operations Room (JSOR) and all supporting plant/infrastructure, for the Orken Complex. Final construction and completion of internal services and fit-out.
• Orken Utilities Building (UB); fire water tanks, pump sand FW hydrants, potable water storage/distribution, fuel gas let-down station, main gas boilers and HW distribution network, main chilled water plant and CW distribution network, potable water (PW) distribution network, water treatment facility, sewage pump stations, central wastewater/sewer system.
• Brownfield tie-ins from Kulsary/Tengiz main utility corridor and from TCOV camp into Orken Complex. Liaising with third party operating companies
• All landscaping and access roads throughout Orken Complex with FGP Engineering and design contractor
• Hand-over to Systems Completions (SC) team once Mechanical Completion (MC) is achieved
May 2020 — May 2021
1 year 1 month
LLP Sembol
Aktau
Civil engineer
Responsible for construction of 98 villas with golf club and town center.
May 2017 — May 2020
3 years 1 month
Ersai
Kazakhstan, saipem.com
Construction, Real Estate, Architecture... Show more
Civil engineer
1. Construction 32 Meter of Key Jetty 5
2. Construction 150 Meter of Key Jetty 4
3. Construction of Main Shelter (Steel Production Workshop, Size 108x67m)
4. Modernization of Dry-Dock and Construction of Floating Gate 70 m Long.
5. Misc. Office & Training Buildings
• Responsible engineer for all above projects. From the beginning till the end.
• Creating work orders and drawings.
• Preparation of schedule work progress with manpower.
• In charge of subcontractors (providing scope of works and monitoring 100 %)
• Ordering of materials.
• Weekly, daily meetings and reports.
• In charge of all construction and organization activities.
• Legalization of building etc.
August 2016 — May 2017
10 months
Isker Consortium
Kazakhstan
Construction, Real Estate, Architecture... Show more
Civil engineer
FGP WPMP Orken Village Project (TCO)
• Weekly Report and meeting with Client (KPJV, TCO)
• Carry out of current work quantity and estimate future quantity (BOQ) of civil and structural.
• Review and Checking Project drawings according to the construction process.
• Supervision over work performance.
• Preparation of schedule work progress with manpower.
• Preparation weekly report to payment.
• In charge of all precast activities.
June 2014 — August 2016
2 years 3 months
Isker Consortium
Kazakhstan
Construction, Real Estate, Architecture... Show more
Quantity Surveyor
Master contract project (TCO), FGP WPMP Orken Village Project (TCO).
• Involvement in Development and implementation of a strong HSE AND IIF culture on site
• Actively involved with engagement with the onsite workforce on a regular basis
• Assist, Monitor, and Support all civil works.
• Preparation of monthly report M29.
• Preparation of budget documentation.
• Preparation of the monthly work plan.
• Supervision over work performance, in charge of rebar and concrete.
• Review and Checking Project drawings according to the construction process.
• Construction Process Estimation (BoQ).
Skills
Skill proficiency levels
Advanced level
Driving experience
Driver's license category B
About me
Good team player and proficient as a standalone supervisor
Excellent communications skills at all levels
I have a very positive and strong desire to achieve goals
Fully conversant with oil and gas working practices and safety standards.
Higher education (bachelor)
2020
West Kazakhstan Innovative Technological University
Civil construction, Civil engineer
2016
Atyrau institute of Oil and Gas
Oil and gas business, Technics and technologies
2011
Kazakh-turkish high school
high school
Languages
Tests, examinations
2021
Confined Space Entry course
TCO
2021
Safe Excavation Practices course
TCO
2021
Working at heights course
TCO
Citizenship, travel time to work
Citizenship: Kazakhstan
Permission to work: Kazakhstan
Desired travel time to work: Doesn't matter