Planning Manager / Contract-Claim specialist
6 000 $ in hand
Specializations:
- Construction project manager
Employment: full time, part time, project work, work placement
Work schedule: full day, shift schedule, flexible schedule, remote working, rotation based work
Work experience 16 years 5 months
February 2018 — currently
7 years 3 months
GHANTOOT GROUP
Planning Manager / Contract-Claim specialist
Projects;
1-The Palm Jumeirah West Beach Club The project comprises of Construction of The Palm Jumeirah West Beach Club comprises a beach club with ground and first floors as well as a service block, swimming pool, water feature and outdoor deck area, with a total built-up area of 6,526 sq. m. The project contains three main provisional sum items; Access jetty, Signage, Water Feature;
2-Dubai Industrial City - Labor City 5 “Labor Accommodation Building” Labour City 5 is located in Dubai Industrial Park, South of the Emirate the total area of the project is about 16.2 hactars based on the latest affection plan. It is planned to accommodate approximately 14,000 men and is generally composed of 26 no. identical resident buildings (G+4), 7 no. dedicated canteens, associated infrastructure and landscape. The Labour City 5 Project was originally commenced in September 2006 and subsequently halted in 2008 some 10 years ago mid construction. Tentative estimates have gauged the project at circa 70% complete, however much of the works constructed previously have been left unattended and exposed to the environment for the past 10 years.
3-Dubai, Jumeirah Village Triangle Twoer “The One Hotel” The One Hotel project by The First Group aims to create a fabled 5 star hotel development in a vital location in Jumeirah Village Triangle, offering the future residents/guests a unique experience of luxury. The development consist of abasement, ground, 4 podiums and 28 tower levels, with 191 car parking lots and a total built up area of approximately 49756m2.
Claims / Extension Of Time;
Abu Hail New Health Center, Dubai
Umsoqime New Health Center, Dubai
Alqausis New Health Center, Dubai
Construction of HHS Rashid Bin Mohammed Bin Rashid “Masjid in Muhaisnah”
The Palm Jumeirah West Beach Club
June 2016 — February 2018
1 year 9 months
Emirates Link Maltauro L.L.C
Planning Manager / Contract-Claim specialist
Develops, reviews and maintains project plans and schedules (equipment/manpower/procurement) using Primavera Monitor progress throughout the construction process on a weekly basis and compare with projected schedule of work. Responsible for reviewing bill of quantities, scope of work, preparation on contract program and identification of milestones. Preparing, monitoring, adjusting and updating the cost plan and cash flows accordingly and the consolidation of these results in weekly reports.
Reviewing in conjunction with the Project Manager or Construction Manager any potential changes, and in turn measuring where possible future saving or additional costs can be identified. Work with project Quantity Surveyor and ensure alignment of planning and cost control reporting requirements.
Deal with extension of time claims Ensure proper records are set up to evaluate delays and extensions of time. Selecting the appropriate techniques and sequence of events for a particular project. Create and revise master schedules for Operations and detailing the sequence of all work to being performed. Interface with Operations, Owners, and Subcontractors to discuss impact of work and resolution of problems and coordinate work sequences within the total Project plan. Study and assessment of anticipated effects that variations may have, both at a later stage and in other areas.
Projects;
Ministry of Justice and Federal Courts Complex
The project comprises of Construction of Ministry of Justice and federal Courts Complex, Theatre Building, Utility Building, Service Building, Gate Buildings and all associated services with miscellaneous refurbishment, adjustments tidy-up of various existing services work, External, Boundary Wall + Gates and Landscaping and structures. Where the Built Up- Area: Approx. 48,200 M2 and Major Quantities Concrete m3 - 13,627, Stone Cladding m2 - 17,436, Steel Structure (180 Ton)
Soho Twin Commercial Buildings
construction, completion and maintenance of a commercial twin buildings on three basement and one pouduim For Bloom Properties, 3b+1P+G+M+13+R
WALID MOHAMED EMAM SAAD Page Two
PROFESSIONAL EXPERIENCE (Continued)
Claims;
Design and Built EIDA HQ and Service Point Building Project at Khalifa A City, Abu Dhabi.
Tender;
Park side Tower by Tameer Holding Investment LLC,
Two towers on one pouduim and 3 basment, ground plus 43 floor and roof on the shore of the Reem island
January 2016 — June 2016
6 months
Hashim General Contractor
Senior Planning Engineer/ Contract-Claim specialist
Short period contract with Meduim firm has 14 onging running projects mainly Deal with extension of time claims, advise on the contractual risk issues on Conditions of Contract and Cost Claim, Extension of Time Claims and contractual procedures. The main scope to finalize the opening claims. Supervising the projects monitoring and conrol. Moreover, responsible for analyzing the new contracts for the extension of time claims, evaluation, assessment and resolution of the same.
Claims;
* Emirates Transport Musaffah-M40 ;
* construction, completion and maintenance of a commercial building for mis.heirs ofbakheet mohamed bakheet al mazroui, 3b+g+m+13+r (sector e-14. plot no. c-37 abu dhabi uae) ;
* Commercial Buildins for Mr. Khalifa Harib Meghair Al Khaili. Sector E16/1, Plot C-29, Abu Dhabi. UAE ;
* Construction Commercial Residential Building: B+G+2Office+Residential roof at Al. Ain/ Plot: 18-11-137-252
Baseline preperation;
* ADCO Mosque ;
* Commercial Building for Mr.Seed Harboush Al Suwaidi (3B+GF+MZ+7Tupical+Roof+Top Roof) Khliafa City A ;
* Masder Eco villa Grean System ;
October 2014 — January 2016
1 year 4 months
Hill International Management consulting company
Senior Planning Engineer
Senior Planning Engineer, / PMC (ADNOC Representative)
Reviews design scope criteria and quantities for completeness and reasonableness, and coordinates with the project to develop schedules. Reviews or assists in reviewing provisions related to schedule and material control, and develops supporting data for contract negotiations. Interfaces with designated PMC, Contractor(s), and ADPC counterparts for specific planning and scheduling tasks. Performs schedule development, maintenance, and monitoring activities. Supports project organizational and administrative activities when delegated. Supervises planning/scheduling activities. Plans and supervises the effort to establish milestone for all types of packages (engineering, construction, etc.). Reviews package/contract work activities to ensure the support of the milestones. Coordinates the timely, systematic, and complete acquisition of scope definition and related data. Plans, organizes, and develops schedule resource loading and leveling.
Coordinates development of all bulk commodity release and installation curves. Integrate appropriate staffing requirements for each discipline/specialty relative to the overall project needs. Assists in determining quantity and staffing levels in support of the project needs and schedule philosophy. Manages the flow of schedule information by all disciplines to maintain & update the integrated master schedule. Works with others in identifying schedule restraints and their effects on the total project schedule.
WALID MOHAMED EMAM SAAD Page Three
PROFESSIONAL EXPERIENCE (Continued)
Works with all departments to ensure an understanding of the total project schedule needs. Responsible for total integration of schedule activities. Identifies schedule considerations and problems resulting from inter-discipline or group restraints and interfaces.
Supports development of scheduling standards and procedures. Compiles, summarizes, updates, and maintains historical schedule data. Monitors and reports critical-path and schedule performance of the total project. Develop project schedule analysis and studies of problem areas to determine criticality of schedule activities.
Recommends alternatives for schedule improvement to project team for discussion and/or decision. Prepares and presents the Schedule Impact Report. Leads the development and review of schedule recovery plans, including evaluation of additional resources/costs required to affect such plans. Prepares and help presents planning and scheduling information to management.
When required, responsible for establishing and maintaining the Engineering and Procurement Schedules utilizing Primavera. Detailed schedule development duties include establishing the work breakdown structure (WBS), determining the work activity duration and establishing the proper work flow logic ties. Routine analysis and work around option planning along with interface coordination with the construction will be required.
Projects;
* NEW GUEST HOUSE AT RUWAIS.
The PROJECT consist of Main Guest house Building + Substation + shaded /non shaded external car Parking. Main Guest House Building is Ground +5 typical floor plan + Roof. The public areas and building facilities as it divided into 2 building with same ground floor. Total number of keys 206 including 16 VIP guest room, 4 VVIP guest suite, VIP amenities (Lounge , Meeting rooms , Business Center ...etc). Roof Floor contain chillers, pump room etc.
* DESIGN & BUILD OF SERVICE HARBOUR AT RUWAIS INDUSTRIAL AREA
The Project is the EPC Contract for the Construction and Upgrading of the Phase II of the Ruwais Industrial Area Services Harbor (RIASH) at Ruwais Industrial Area. The PROJECT calls for the demolition of the existing structures and building new buildings that shall comprise the following:
Replace Locker and Training Building, New Stores Building (Diving Stores),
New Workshop (Electrical, Carpentry), New Mosque,
Replace existing Workshop (Mechanical Workshop), New Metal Workshop (Welding and Metal Fabrication),
Modify Sand Blasting Workshop, New Recreation Center to include Majlis,
Port Harbour Control Tower, External works
* New International School at Ruwais
The work provided in the contract undertake the carrying out and construction of New International School at Ruwais City the work includes main School building, Substation, Swimming Pool, Karting Storage, Guard Room and external works including landscaping. The covered area is approximately 9103.00 sq. m.
* Al Ruwais mall Phase two
The second stag for Ruwais Mall 3 floors and tent sky light. The project consist of 1 food court for 17 franchies, kids Intertainment Area 700 Sq.M., Cenima with 4 show halls and one VVIP show hall, Ice skitting area 80 M2 and shops area to serve 6 Services shope like banks and government services and 95 Comecial shop.
* Renovation and Upgradation of the Existing Ruwais Recreation Center
The project site is located in the Ruwais Housing Complex (RHC), approximately 240km TO THE WEST OF Abu Dhabi City. Ruwais recreation center was built in 1984, since its construction, it served Ruwais housing complex residents through facilities spread in one block of two floors (Ground + First) including: Indoor playgrounds and daycare, Offices, Library, Cinema, Theatre, Bowling center, Tennis courts, Squash courts, Gym, Restaurants, Swimming pools, Kids playgrounds, Coffee shop and cafeteria.
WALID MOHAMED EMAM SAAD Page Four
PROFESSIONAL EXPERIENCE (Continued)
More over Project included the renovation of the existing facilities and construction of new facilities as follows:
Super market and retail area, Food court. The total built up area of the project including renovation and construction is 63,543 m2
September 2013 — October 2014
1 year 2 months
Intermass Engineering & Contracting LLC. Co.
Senior Planning Engineer
Develops, reviews and maintains project plans and schedules (equipment/manpower/procurement) using Primavera Monitor progress throughout the construction process on a weekly basis and compare with projected schedule of work. Identify and review regularly, critical and sub-critical activities and monitor its impact on project schedules Develop and maintain project change control and review scope change requests for impact on schedules and the critical path of the project in addition to prepare method statement.
Produce master and detail pre-construction and post construction schedules. Overseeing actual project progress versus the planned work milestones, in addition to reviewing consultants' and contractor's work program submissions. Generating milestones in the pre-construction and construction stages for inclusion in tenderdocuments via detailed discussions with the relevant stakeholders.
Preparing, monitoring, adjusting and updating the cost plan and cash flows accordingly and the consolidation of these results in weekly reports. Reviewing in conjunction with the Project Manager or Construction Manager any potential changes, and in turn measuring where possible future saving or additional costs can be identified. Work with project Quantity Surveyor and ensure alignment of planning and cost control reporting requirements.
Attend regular monthly/weekly progress review meetings with clients and subcontractors and prepare work schedule for subcontractors. Prepare monthly/weekly reports on project status and progresses and review project close-out reports. Monitoring of actual construction progress against the approved construction program. Use of appropriate software to update construction programs on a regular basis and produce reports and charts which allow the Project Manager an easy evaluation of construction progress and the main issues which might cause delays or cost overruns. Develop alternative construction programs if site conditions or other circumstances require corrective steps to accomplish the final construction completion date. Assist Project Managers in creating short-term schedules, monitor such schedules to determine impact on master schedule, and help in formulating actions to correct scheduling problems and Analyze deviations from the plan and determine the effect of change from the plan recommend workarounds to mitigate on a proactive basis.
Always deal with extension of time claims as a priority. Ensure proper records are set up to evaluate delays and extensions of time. The project consists of establishing, executing, and handing over and Maintenance of a 51 Facilities distributed on three zones, including external works & grading works for entire project area, the major facilities of the project are Facility (2) Military Secondary School), Facility (24) Sport complex & Facility (23) Students Accommodation. Clinick , Resturant, Prisons & Playgrounds. Project total budget 349,000,000 AED.
DETAC For trading & constructions Cairo, Egypt February 2010 - April 2013
Planning Engineer/ContractorProject Control: (Baseline Preparation, Monitor and control roles)
WADI EL NILE (extension administration buildings at NASER CITY)
Mirage Mall at Cairo- Suez Desert Road
Plant Pesticides (Military Production Factories)
KATTAMYA PLAZA ( NEW CAIRO CITY ) , (Owner SODIC)
MAKRO kalyobia (Makro cash & carry
Mivida Compound NEW Cairo AL-AMAR Group, Turner PMO
Dmac Block C New Cairo (DAMAC), ECG counsultant, NEW CAIRO CITY
Adminstration building For Administrative Prosecution
September 2009 — April 2013
3 years 8 months
DETAC Dar For trading & constructions
Planning Engineer
Project Control: (Baseline Preparation, Monitor and control roles)
WADI EL NILE (extension administration buildings at NASER CITY)
Mirage Mall at Cairo- Suez Desert Road
Plant Pesticides (Military Production Factories)
KATTAMYA PLAZA ( NEW CAIRO CITY ) , (Owner SODIC)
MAKRO kalyobia (Makro cash & carry
Mivida Compound NEW Cairo AL-AMAR Group, Turner PMO
Dmac Block C New Cairo (DAMAC), ECG counsultant, NEW CAIRO CITY
Adminstration building For Administrative Prosecution
Revised Baseline and claims:
KATTAMYA PLAZA ( NEW CAIRO CITY ) , (Owner SODIC)
WADI EL NILE (extension administration buildings at NASER CITY)
GIZA SYSTEMS administration Building (New Cairo)
Mirage Mall (New Cairo)
Projects Progress support
Chamber of Commerce (New Cairo)
AMWAL AL ARABIA at (SMART VILLAG)
SVREICO Office Complex B16, B109 & B143 (SMART VILLAG)
GIZA SYSTEMS administration Building (New Cairo)
Mubarak Library (AT Middle Cairo)
Mivida Compound (Compound) AL-AMAR Group, Turner PMO
Park Avenue block C New Cairo (DAMAC), ECG consultant
August 2008 — September 2009
1 year 2 months
Pillars Egypt Consultant
Structural Engineer
Working in Pillars structural analysis engineer, design, shopdrawings (commonly concrete and steel structure), working drawing, B.O.Q and calculation sheets....etc.
Skills
Skill proficiency levels
Driving experience
Own car
Driver's license category CAbout me
Detail-oriented Civil Engineer with an extensive record of success managing projects technically and contractually from the contractor perspective in all phases including concept design, mobilization, construction, commissioning and contract close-out. Expertise in complex project management for commercial and industrial structures as well as energy facilities. A successful background of combining in project control, Claims, time impact analysis, planning, scheduling, project management, contracts, proposals preparation, structural design, shop drawing in addition to quantity survey. Participate in ongoing professional development and completion of engineering and project management certifications. Currently completing advanced studies in construction law. A cost effective professional able to solve issues and provide a strong product. Additional experience in information technology; developed interactive spreadsheets and macros using software programs. Fluent in Arabic and English.
Higher education (master)
2020
MSc in Construction Law and Dispute Resolution
law, Bussiness law
2013
MASc in Civil Engineering
Civil Engineering, Structural Engineering Concrete Structures
2010
Diploma IN Construction Project Management
Construction Managment, Construction Project Management
2010
Fundamental Engineering
NCEES
2008
B.Sc. Civil Engineering