Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Был на сайте вчера в 13:37

Кандидат

Мужчина, 41 год, родился 26 ноября 1983

Не ищет работу

Актау, не готов к переезду, готов к командировкам

Указан примерный район поиска работы

Welding and Hydrotesting inspector Pipeline

Специализации:
  • Другое

Занятость: полная занятость, частичная занятость, проектная работа

График работы: полный день, сменный график, вахтовый метод

Опыт работы 17 лет 8 месяцев

Декабрь 2023по настоящее время
1 год 5 месяцев
Air Energi Caspian LLP trading as Airswift (Project Tengiz Operation Pipeline System). ( Reliability Corrosion Pipeline Group)
Field Pipelines Inspector
• Provides input to ROAIMS and Capstone database on Inspection. • Monitors and reports the technical condition and safe operation of piggable and unpiggable pipelines by evaluating design, process conditions and inspection data. • Evaluates equipment integrity and corrosion trends for indications of equipment degradation (wearing) and potential failures. • Recommends remedial actions and develops future inspection strategies and plans. • Determine and evaluate corrosion mechanisms and solve problems related to equipment reliability. • Determines inspection and non-destructive examination work scope, participates in turnaround scope development when necessary. • Recommend equipment repair and quality control plans. • Maintains accurate, detailed, and quantitative record keeping of inspection events both Electronic and physical. • Maintains and updates records made in pipeline and piping documentation. • Monitors all Field modifications and repair work for Quality and specification compliance.
Июнь 2023Декабрь 2023
7 месяцев
KCOI LLP

Атырау, www.kcoi.kz

QC Welding inspector pipeline (Project 1BCMA pipeline Karabatan to Qazaq Gaz 15 km)
• Quality control inspection of welding activities as per approved ITPs and specifications during pipeline of process work. • Perform in-process inspections including material receiving, welder qualification, pipe alignment, and visual inspection. • Monitoring of welding parameters during welding. • Checking consumables as per approved weld procedure specification (WPS) • Checking consumable storage conditions ensuring correct temperature and humidity. • Checking WPS, PWHT, hardness testing, and NDE. • Checking the relevant drawing. • Confirm the correct welding procedure to be used, in conjunction with the line classes, and design weld size requirements. • Checking the qualifications of the welder(s) allocated to this work. • Checking welder has the correct consumables and that the electrodes have been correctly treated/stored. • Inspect weld fit-up and alignment are correct. • Check correct preheat is applied. • Monitoring essential variables during welding e.g., electrical characteristics preheat inter-pass temperature, etc. • Final visual Inspection of weld
Август 2019Май 2023
3 года 10 месяцев
Bolashak Atyrau LLP
QC Welding - Hydrotesting Inspector(Project FGP Tengiz Gathering System pipeline)
Verification and monitoring of contractor quality control for pipeline welding fabrication and hydro test activities Welding activities- • Check consumables as per approved weld procedure specification (WPS) • Check consumable storage conditions ensuring correct temperature and humidity • Check WPS, PWHT, hardness testing, NDE • Check the relevant drawing • Confirm the correct welding procedure to be used, in conjunction with the line classes, and design weld size requirements • Check the qualifications of the welder(s) allocated • Check welder has the correct consumables and that the electrodes have been correctly treated/stored • Inspect weld fit-up and alignment are correct • Check corrects preheat is applied • Monitor essential variables during welding e.g., electrical characteristics preheat inter pass temperature, etc • Final visual Inspection of welds • Post-weld heat treatment • Check that thermocouples are attached correctly and that recording instruments have current calibration and heating/cooling rates. Cleaning and gauging hydro testing activities- • Inspection pipeline cleanliness and gauging scraper condition • Review test pack and witness hydrostatic test on site • Check the water analysis test certificate • Verify instrument calibration certificates • Verify the location and connection of all pressure and temperature test instruments • Check for leakage signs at specified times during pressurization. • Pressure Test Charts and Certificate signed by relevant parties • Reinstatement with the installation of permanent line valves • Inspect flange faces, gaskets, and bolt torquing • Verify bolt, coating, size (diameter and length), and material prior to installation • Verify flange face for damage and cleanliness and preparation for gasket • Verify correct Gasket • Verify two-hole alignment correct • Witness flange joint • Verify as per Isometric • Verify correct bolt tensioning • Dry air drying. Monitor dry air-drying activity until the specified dew point at the pipeline outlet is attained • Nitrogen purge/fill/overpressure. Verify pipeline nitrogen purge/fill completely. Check low-pressure gauges installed at each end of the pipeline. • Verify all completion of pre-commissioning activities Monitor progress of all quality, inspection, and testing activities against contractor and subcontractor ITPs Witness Welder Qualification Testing. Perform walk-downs and document results to ensure compliance with project specifications and procedures. Monitoring contractor performance and review of documentation like QVDs as work progresses will be required Control of welding and NDE activities for the piping, pipeline, and steel structures to accordance with ASME IX, ASME V, ASME B31.3, API1104, AWS D1.1, and client specifications
Июль 2016Июль 2019
3 года 1 месяц
Bolashak Atyrau LLP
QC Inspector General (Structural, Piping, Material ,Welding inspector)(Project FGP Tengizchevroil) (Ersai LLP facility for the manufacture of pipe racks)
Monitor the activities of the contractor and sub-contractor inspectors to ensure a consistent approach to welding, construction, and NDE issues. Review site procedures, personnel qualification, equipment calibration records, and drawing revision status to ensure they are the latest revision and meet the project requirements. Reviewing Welding Procedures and Non-Destructive inspections, proposed by Construction Contractors. Controlling Welding Qualification inspections and approving Welding Procedures and Welder Performance Qualification including Destructive and Non-Destructive tests. Controlling welding activities to be performed as per Contract requirements, procedures, and specifications. Controlling, reviewing, and verifying Welding Quality records. Verification consumables as per approved weld procedure specification (WPS) Verification of consumable storage conditions ensuring correct temperature and humidity Verification WPS, PWHT, hardness testing, NDE Verification of the relevant drawing. Monitoring correct welding procedure to be used, in conjunction with the line classes, and design weld size requirements Verification of the qualifications of the welder(s) allocated. Verification welder has the correct consumables and that the electrodes have been correctly treated/stored Inspection of welding fit-up. Check correct preheat is applied. Monitor essential variables during welding e.g. electrical characteristics preheat interpass temperature, etc. Final visual Inspection of welding Post-weld heat treatment inspection
Апрель 2014Июнь 2016
2 года 3 месяца

Промышленное оборудование, техника, станки и комплектующие... Показать еще

Lead Quality Engineer
Responsible for the implementation of the Quality Control Inspection Plan namely quality welds and pipes. Ensure all works conform to clients’ specifications & contractual requirements. Decision-making in case of doubtful questions on the account of the status of products. Coordinate the work of quality engineers and quality inspectors. Substitution of duties in the absence of the QC manager. Defect analysis and preparation of weekly/monthly Defect Reporting for the Quality Manager. Training of all inspectors VT staff (visually-measuring control), identification of visible defects, measurement of geometric dimensions (length, width, ovality, curvature, etc.), work with tools (thickness, roulette, calipers, etc.) Training in accordance with GOSTs, ASME, API, and AWS. Departure for business trips on Customer's issues related to VT (visual and measurement control). Development of procedures and working instructions for quality control. Participation in audits (internal and external). Conducting SFA audits at the workshop level and MO multi-level assessments and preparation of reports. Responsible for Radiation Safety, and preparation of reports. Control over the maintenance and completion of logs, reports, route maps, and formats. Preparation of documentation (business letters, statements, invoices, and applications). Walk around the shop and control the discipline of QC inspectors.
Май 2010Апрель 2014
4 года

Промышленное оборудование, техника, станки и комплектующие... Показать еще

Quality Engineer
Welding process checks Fit-up. Post-welding inspection. In-process inspection & monitoring. Welders’ skill qualification. Witness Qualification of Welding Procedures. Prepare and organize welder’s qualification test, PQRs, and WPS. Supervises accountability and quality control of inspectors at inspection sites. Monthly, quarterly, and annual reports on the quality of products. Preparation of pipe quality certificates. Development of procedures and working instructions. Monitor the welders during performing pipe repairs. Monitor the quality of the work, directly or indirectly affecting the quality of products, to ensure quality. Recognize the cause of deterioration in product quality. Preparation of a plan to ensure the quality of products. Conducting Audits at the workshop level (SFA). Preparation of monthly material reports. Submission of applications in case of equipment breakdowns. Conducting daily training Toll Box.
Сентябрь 2007Апрель 2010
2 года 8 месяцев

Промышленное оборудование, техника, станки и комплектующие... Показать еще

QC inspector
Visual inspection of pipes as per WPS, namely the quality of welds, welding defects and the body of the pipe and any visually visible defects, the diameter of the ends, the diameter of the body, the wall thickness, length, height, width of the roller, sheet edge offset, bevel angle, edge blunting, straightness, perpendicular, etc. Weld inspection of defects. Control of hydro test of pipes. Checking the quality of the main raw materials (hot rolled coils, welding wire, flux welding, and electrodes) checking the manufacturer's certificates, namely chemical and mechanical properties, etc. In accordance with GOST, API 5L, ASME, AWS, and customer specifications.Verification of consumables as per approved weld procedure specification (WPS). Verification of consumable storage conditions ensuring correct temperature and humidity. Checking the correct welding procedure to be used. Filling of reports on the checked pipes. Marking of pipes.

Навыки

Уровни владения навыками
MS Outlook
MS PowerPoint

Опыт вождения

Имеется собственный автомобиль

Права категории B, C

Обо мне

To work with an organization where I can continuously learn in the pursuit of achieving functional excellence, thus getting maximum job satisfaction and optimum career growth.

Портфолио

Высшее образование

2023
Kran Service LLP
Welding, Level 2 Welding Specialist Certificate No. 095 exp. June. 2026
2022
AWS (American Welding Society )
Welding, Certified Welding Inspector
2022
Certification in the field of nondestructive control
NDT, NDT inspector(VT,MT,PT,RT,UT)
2019
Benar Solutions
Bolt flange assembly, Manual/Hydraulic Tightening
2005
Aktau State University named after Sh.Esenov
Institute:Oil and Gas, "Mechanical Engineer"

Знание языков

КазахскийРодной


АнглийскийB1 — Средний


РусскийC2 — В совершенстве


Гражданство, время в пути до работы

Гражданство: Казахстан

Разрешение на работу: Казахстан

Желательное время в пути до работы: Не имеет значения