Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas online more than two weeks ago
Candidate
Female, 49 years, born on 21 June 1975
Aktau, not willing to relocate, not prepared for business trips
The approximate area of the job search is specified
administrator, document controller
Specializations:
- Other
Employment: full time, part time
Work schedule: full day, remote working
Work experience 15 years 5 months
July 2018 — April 2019
10 months
Engineering Center LLP, Aktau
Translator (full-time)
Translation of technical report on survey of facilities in oilfield LLP, presentation on facilities survey, site report of Oil&Gas Processing Facilities for Emir Oil LLP, bidding documents, minutes of meetings.
August 2017 — July 2018
1 year
Engineering Center LLP, Aktau
Translator (part-time)
Translation of bidding documents, CV's of personnel
June 2015 — August 2017
2 years 3 months
Engineering Center LLP, Aktau
Translator (full time)
``Construction of plant for premium threaded connections'' for Tenaris company. Basic and detailed design.
Translation of the following:
AutoCAD drawings on different design disciplines (Architectural and Civil, Water supply and sewage, Power supply, Processing technology, HVAC, Automatic fire alarm);
Explanatory Notes;
EIA;
Structural design calculations;
Extractions from GOSTs and SNiPs;
Technical Queries on different disciplines;
Business correspondence;
Constituent documents of the company;
Bidding documents.
April 2015 — June 2015
3 months
Engineering Center LLP, Aktau
Translator (part time)
``Construction of plant for premium threaded connections'' for Tenaris company. Basic design.
Translation of the following:
* -AutoCAD drawings on different design disciplines (Architectural and Civil, Water supply and sewage, Power supply, Processing technology, HVAC, Automatic fire alarm) ;
* -Explanatory Note;
* -Structural design calculations; ;
* -Extraction from regulatory documents of the Republic of Kazakhstan;
* -Technical Queries on different disciplines;
* -Business correspondence.
September 2014 — June 2015
10 months
Center of Foreign Languages "Best", Aktau
English teacher (part-time work)
Teaching English at elementary-upper-intermediate levels.
November 2012 — September 2014
1 year 11 months
Foreign Language Center "Best", Aktau
English teacher
Teaching English at elementary-pre-intermediate levels
April 2008 — November 2012
4 years 8 months
Witteveen+Bos Kazakhstan LLP
Translator
Translation of different documents for Human resources department, bookkeeping documentation, drawings, technical tasks, proposals, project plans, technical notes, contracts, carrying on business correspondence with clients:
Translation on the following projects:
* Concept and Detailed Design on "Reclamation and retaining wall for Oil terminals №№ 14, 15, 16, 17 in North Aktau Port" for "AISTP";
* Detailed design for the "Fabrication yard at the east cost of Tub-Karaganskiy bay for steel structures plant for marine oil field developments''. ;
* Reconstruction of water supply and sewage networks in Aktau. ;
* Kashagan Development Experimental Program. Island EPC-2,3,4 ;
* Design review analysis for Crescent Project. ;
* Feasibility study report for distribution and transhipment complex in Aktau.
* Basic and Detail Design for ''North Caspian Ecological Response Base in Atyrau region'';
* Detail Design for "Construction of multifunctional loading/offloading terminal''.
Desalination plant in Ersai Base, Kuryk village.
February 2007 — March 2008
1 year 2 months
Petrofac International Limited, UAE, Sharjah,
Translator/Administrator
Karachaganak 4th Stabilisation and Sweetening Train Project (KAZAKHSTAN),
Offshore subcontract with Petrofac International Limited, Sharjah, UAE.
Detailed design.
Construction Project of Condensate Rail Loading of KPC 4th Stabilisation and Sweetening Train. Karachaganak Field. FEED Stage.
Translation of the following:
* Extraction from Departmental Guidelines on Design of Fire- Protection Measures for Enterprises, Buildings and Structures in Oil Refining and Petrochemical Industry;
* Extractions from RoK Construction Norms and Regulation.
* Comments.
* Functional Specifications;
* Technical Queries on different disciplines.
* Interpretation of discussion on technical issues with Petrofac engineers.
July 2005 — February 2007
1 year 8 months
Caspian Engineering & Research LLP
Translator/ English teacher
Translation on the following projects:
"Oil Demercaptanisation Unit within Chinarevskoye Oil, Gas & Condensate Field Project''.
Translation of drawings and specifications.
``Kashagan Field Development-Experimental Program''.
* Specifications, project documentation and drawings. ;
* Offshore Complex D. Living Quarters.
* HVAC drawings.
``Feasibility Study for Construction of Karachaganak-Uralsk Gas Pipeline''.
* Translation of Explanatory Note, drawings and Pre-EIA.
``Alibekmola Field Surface Facilities Construction for Operation and Maintenance Phase''.
* Translation of weekly and monthly reports.
``Construction of Karachaganak 4th Stabilisation and Sweetening Train Project''
* Translation of Explanatory Note, Declaration of Intent, Pre-EIA, Subcontract and Tender Documentation;
* Teaching English to Company's employees.
September 2004 — July 2005
11 months
College of foreign languages, Aktau
English teacher
Teaching English
September 2003 — May 2004
9 months
Private school "Daryn"
English teacher
Teaching English to children.
Skills
Skill proficiency levels
Higher education
2009
Aktay State University named after Sh.Yessenov
Foreign Languages, Bachelor of translation major
2000
College of foreign languages
Foreign Languages, English teacher
Languages
Citizenship, travel time to work
Citizenship: Kazakhstan
Permission to work: Kazakhstan
Desired travel time to work: Doesn't matter