Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was online today at 07:25

Candidate

Male, 34 years, born on 30 March 1991

Actively searching for a job

Atyrau, willing to relocate (Aksay (Kazakhstan), Aktau, Atyrau), prepared for business trips

Regulatory affairs.

Specializations:
  • Other

Employment: full time, work placement

Work schedule: full day, shift schedule, rotation based work

Work experience 12 years 8 months

January 2023currently
2 years 4 months
Kazakhstan Caspian Offshore Industries LLP

Atyrau, kcoi.com

Construction, Real Estate, Architecture... Show more

RA Engineer
Client: NCOC N.V Project: 1BCMA Object: New Raw Gas Pipeline from OPF Bolashak to QazaqGaz Plant.
May 2022December 2022
8 months
Engineering Services Provider LLP

Atyrau, esp-group.kz/

RA Coordinator
Client: Tengizchevroil (FGP/ WPMP Project 3GP/ 3GI) Monitoring pre-commissioning and commissioning process in compliance with TCO and RoK standards requirements •​Coordination with client Regulatory Authorities, and response to issues raised by client and RoK Authorities. •​Maintaining tools for RA tracking and reporting process under project scope, including RA registers, matrices (RVD/QVD,RAPMD, metrology, technical passports, orders registers). •​Conduct RA and Quality surveillance checks/Weekly Internal audits according to approval from SC manager at assigned sites regarding proper management of documentations •​Notify and Coordinate with TCO RA SC Coordinator, Authorship & Technical supervision to complete SC documentation . •​Advise project management on appropriate strategies for complying with RoK Regulatory requirements on Tengiz project •​Participate / conducting of facilities acceptance process and manage the process of obtaining declaration on compliance from Sub Contractors, Conclusions on Quality and Design Compliance from Technical and Authorship Supervision Reps
June 2021March 2022
10 months
Caravan Resources Group LTD Project LLP Kazminerals Project BV.

Almaty, ksak.kz

AS-BUILT Documentation Engineer
Client: ''LLP KAZ Minerals'' Construction of the Aktogay Expansion Project Sulphide Plant • Preparing redline drawings to accommodate changes/modifications during various stages of commissioning team. • Complete field inspections to identify all changes in the drawing during execution. • Mark-up all changes according to the applicable scope of work in subsystems as per RFIs. • Maintain redline master register per subsystem for the project. • Preparing new RFI for approval with corrections on the drawings as per the actual site situation. • Submit drawings to ''KAZ Minerals'' for review and approval. • Communicate with site personnel and other affected teams to ensure Database changes are understood and implemented as agreed. Implement systemized drawings changes, including issuing work scope boundary mark ups when needed. • Making weekly / monthly reports on the progress of performed work. • Preparation of drawings for sending to the document control group and uploading to the EDMS system • Interaction with the customer, contractors / subcontractors and design organizations. • Providing the weekly toolbox meeting for working teams. • Inspection of employees' compliance with safety regulations. • Providing additional information on the GOST specification.
February 2019April 2021
2 years 3 months
Bonatti S.p.A Kazakhstan Branch

Atyrau, www.bonatti.it

Ra Specialist
Client: "LLP Tengizchevroil & KPJV" Future Growth Project / Wellhead Pressure Management Project (FGP/WPMP), Pipeline area 51 Tengiz, Kazakhstan. The issue of as-built technical documentation in accordance with construction norms and regulations RK(reports,statements,Protocols,Passport) of the test piping, equipment, alarms detection pig to matches procedures and drawings. Logging General works, magazines of manufacture of works. Joint work for the Unification of the Group Commissioning(ICAT). Check for licenses, permits, passports and certificates for materials, equipment and their compliance with the standards and technical requirements of the RK.(etnicheskii passport,certificate of conformity and Metrology, laboratory test results, etc.). The surrender of objects (part of systems) sanitary and epidemiological service of HVAC system for measurements of noise, vibrations, lighting, air exchange, ventilation, radiation. The delivery of production objects and Technical Working commissions.
November 2020January 2021
3 months
Consolidated Contracting Engineering & Procurement S.A.L. - Offshore via TOO FSSA

Atyrau, www.ccc.net

Act Coordinator Temporary employment
Client: " LLP Tengizchevroil & KPJV" Advanced knowledge of RoK Civil / Structural Engineering Standards and Building codes, TCO Engineering standards, Construction methods and materials, and ability to easily read and understand technical documents and drawings. Responsible for QC documents of the complete project including certificates, calibration, test results, inspection requests, non-compliance reports and site instruction/observations, permanent materials delivered and other important QC documents. Created inspection requests for Civil, Mechanical, Welding work Registration & monitoring NFI’s / ACT’s The ability to read, understand and communicate the Projects codes, standards, drawings, specifications and Contract documents Report to the QC Manager, control, and monitor all activities related to Quality. Completion and Turnover of Completed Systems. Teaming up with other documentation groups. Coordinate all activities related to the Document Control procedure, including technical documents, drawings, and commercial correspondence. Input document data into the standard registers ensuring that the information is accurate and up to date. Makes sure that controlled copies of latest approved documents and drawings are given to the appropriate staff, subcontractors and suppliers as applicable Maintain updated records of all approved documents and drawings and their distribution clearly Maintain the documents and drawings in the Document Control office under safe custody without any damage or deterioration with easy traceability. Maintain the files and control logs as required by the project. Ordering and submission of all documents of QC department. Preparation of Acts and Checklists: Civil, Mechanical and Painting works Preparation of Turnover Dossier, Test Pack, Piping Passport and so on. Preparation of Turnover dossier, Control and registration of Checklists, Acts Ordering and submission of all documents of QC department, Control and Checklists and acts registration Monitoring of documents by Index. Update and issue Transmittal of Data package report To control and integrate acceptance documentation on all the disciplines, as required by the procedure. To create initial indexes of quality control documentation. To update indexes according to comments and changes in the project and re-issue them when required. To issue requirements to acceptance documentation on a working package or on systems/subsystems. Collect the data from all departments such as Material, Engineering, Pre-Commissioning, DCC. Updating Database to any modification and changes By Engineering Department.
January 2019February 2019
2 months
GATE Construction via Tenaz Mаnаgment

Atyrau, gatekz.com

Turnover Completion Specialist
Client: "LLP Tengizchevroil & KPJV" Future Growth Project / Wellhead Pressure Management Project (FGP/WPMP), Tengiz, Kazakhstan. Collection and completion of the dossier of acceptance in all disciplines • Upload quality control documents to POL (QVDs with Barcode ACTs) • Filling the NCR register, NFI register, SR register • Closely working with the Turnover group to KPJV limited • Preparation to the reports on the progress of registration and delivery of the turnover dossier.
November 2018January 2019
3 months
FIRCROFT ENGINEERING SERVICES LIMITED, KAZAKHSTAN

Atyrau, fircroft.com

Business Services... Show more

Technical Documentation Engineer (Construction an integrated gas chemical complex in Atyrau region)
Client: "Kazakhstan Petrochemical Industries Inc. LLP" Act of hidden work, Incoming material acts, Act of intermediate acceptance of responsible construction, SNIP GOST VSN
March 2018September 2018
7 months
DORCE Prefabricated Building And Construction Industry Trade Inc

Atyrau, www.dorce.com.tr

QA/QC engineer RA Specialist Construction and operation Dom 6 rotation village Shanyrak (ESS)
Client " LLP Compas Service (ESS)" Quality control of construction and installation works in accordance with the approved procedures and regulatory documents of the RK and the Customer. Quality control of civil works. Contractual and subcontracting companies. Quality control of construction works: for reinforcement, concreting, quality control of concrete structures, laying underground pipes in the trench, building roads, backfilling, erection of metal structures, modular buildings and metallization of the metal frame, cement mortar for equipment, checking the compliance of the thickness of the filling layer and sealing methods. Check the build file. Conformity testing of soil quality. Conducting laboratory tests of construction works. Coordination between managers in terms of implementing measures for pouring concrete and backfilling. Compliance with technical regulations, building codes and regulations, technical conditions and technology of production operations. Ensure the quality of the project through a continuous monitoring system. Acceptance of construction works. Analysis of information obtained at different stages of construction, quality indicators, characterizing the work. Application of measures to prevent the production of work that does not meet the requirements. Participation in the work of the Commission for Acceptance of Construction Projects and Commissioning. Meetings with contractors and subcontractors in solving production issues Verification of any audited activity for the existence of an approved project drawing and a schedule of inspections and tests (ITP) Perform scheduled inspections at sites, in accordance with the inspection requests (RFIs) identified in the relevant inspection and test plan (ITP). Compilation and approval of a verification and testing plan (ITP). Verification of technical design documentation for compliance with regulatory legislation. Check the technical specifications for the design, explanatory notes, drawings, design passports of projects for compliance (RoK SNiP, GOST, VSN, SN, etc.) rules, norms, rules and other requirements applied in the territory of the Republic of Kazakhstan To approve the list of receiving documents, the construction dossier of the Republic of Kazakhstan with the General Contractor and the Customer, author's and technical supervision. Drawing up of authorization documents (Charter license, certification, certificates for materials, orders for personnel, etc.)
March 2017March 2018
1 year 1 month
DORCE Prefabricated Building And Construction Industry Trade Inc

Atyrau

RA Specialist Construction and operation Dom 6 rotation village Shanyrak (ESS)
Specialist of the regulatory and legal department (NGO) Main duties: Implement and control all RA requirements for the Projects. Monitoring the construction process in compliance with the proper RoK regulatory requirements Coordinate regulatory affairs with client regulatory authorities during the construction works to reach maximum compliance of Project activities with RoK Regulatory requirements. Coordination of state inspections by Regulatory Authorities, and response to issues raised by client and RoK Authorities. Maintaining tools for RA tracking and reporting process under project scope, including RA registers, matrices Development of RA procedures, presentations, action plans relating to the regulatory support and work processes. Conduct RA checks at assigned sites regarding proper management of as-built documentation (conclusions, acts, logbooks, protocols, registers required as per RoK SNiP, GOST, VSN, SN, etc) for compliance with RoK laws and norms. Provide clarifications and advising services on compliance with ROK regulatory requirements for various groups in the company and client. Advise project construction management on appropriate strategies for complying with RoK Regulatory requirements on Tengiz construction site. Monitoring the changes in RoK Legislation and advising the project about regulatory requirements to be incorporated into plans & strategies Interfacing with project departments to discuss the implications of the design changes and RoK requirements to the project with regards to Construction and Acceptance process Provide assistance within the competence to eliminate violations identified by client Regulatory Authorities. Interfacing and coordination with multiple other disciplines Attend Construction Management meetings to provide regulatory affairs support as required Advising management on approval strategies and the impact of regulations on other strategies Participate / conducting of facilities acceptance process and manage the process of obtaining declaration on compliance from Sub Contractors, Conclusions on Quality and Design Compliance from Technical and Authorship Supervision Reps, Acts of Acceptance of completed Facilities Perform the key role as described within the company Safety, Health & Environment Policy and Statement and for the implementation of programmes aimed at attaining zero accidents at work.
November 2014November 2016
2 years 1 month
«Cу арнасы» in village Ganyushkino

Atyrau

Water treatment plant operator
To monitor the status and operation of the water purification equipment of (WTO). Participate in the work on commissioning and testing of water purification equipment, its acceptance from repair and installation. Monitor the operation of the equipment according to the production instructions and mode cards. Observe the technology of water purification and treatment, control the availability of consumables and chemicals. Comply with the requirements of technological regulations, GOST, technical specifications and other regulatory and production documents in force in the field of water treatment and water treatment.
June 2012November 2014
2 years 6 months
IE Karekenov K.G.

Atyrau, www.amanat.ssk@mail.ru

RA Specialist
Official duties and achievements Knowledge of normative documents Construction standards and regulations, Control and maintenance of all necessary documentation (Acceptance Certificate for completed works KS-2, KS-3,) Implementation of technical quality control of work performance. Conclusion of contracts with subcontractors and control over their implementation of construction and installation works.
March 2012May 2012
3 months
Practice of Atyrau Su Arnasy

Atyrau, www.suarnasy.kz

Water purification
Modern equipment for natural water treatment and post-treatment of tap water

Skills

Skill proficiency levels
PC MS
MS Outlook
MS Internet Explorer
Internet
MS PowerPoint
Driving license category B
MS Excel
MS Word
AutoCAD

About me

1. 2017 Certificate LLP Prom Expert Service, "Safety and labor protection" 2. Passport HSE NCOC #11328 3. Porting NCOC #99318 4. Porting ТCO #13165373

Portfolio

Higher education (bachelor)

2012
Atyrau State University named after Kh.Dosmukhamedova,
050805-Water resources and water use, Natural science

Languages

KazakhNative


RussianC2 — Proficiency


TurkishC1 — Advanced


Professional development, courses

2017
Zhantumayev Zhetkinshek Mukhambetovich
RA Specialist, DORCE Prefabricated Building & Construction Industry Trade Inc.

Citizenship, travel time to work

Citizenship: Kazakhstan

Permission to work: Kazakhstan

Desired travel time to work: Doesn't matter