Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяКандидат
Мужчина, 47 лет, родился 9 января 1978
Актау, готов к переезду (Алматы, Астана, Другие регионы), готов к командировкам
Инженер/технолог по добыче
7 000 $ на руки
Специализации:
- Другое
Занятость: полная занятость
График работы: гибкий график
Опыт работы 22 года 5 месяцев
Январь 2012 — по настоящее время
13 лет 4 месяца
Petrom S.A (Member of OMV Group), "Tasbulat Oil Corporation" LLP
Актау
Senior Production Technologist
Production monitoring of naturaly flowing wells and solving presence production problems (wax deposition, SKIN effect etc.)
Production monitoring and optimization of wells with artificial lift (sucker rod pumps, electrical submersibile pumps)
Well problem analysis: gives proposals and future recommendations
Well completion – re-completion technology: gives proposals for the new drilled and present production wells
Well testing: Program design and Supervision
Well Flow Performance – Nodal analysis; recommendations for future actions
Artificial lift system selection and design: Sucker Rod pumping, Electricle Submersible Pumping
Well servicing supervising: Planning and supervising
Preparation of the Production forecasts.
Preparation and requesting OPEX/CAPEX materials/services for full production year from Production dept.
Partialy as a planning engineer, suporting Project's department with Project scheduling.
Supervising and optimizing the surface facilities process of crude oil dehydration including: chemical injection rate, temperature /pressure optimization, etc.
Flow Assurance. Full field chemical application program supervising. Implementation of downhole chemical injection to wellbore to improve the flow rate of a wells.
Май 2010 — Январь 2012
1 год 9 месяцев
Petrom S.A (Member of OMV Group), "Tasbulat Oil Corporation" LLP
Актау
Production Technologist
Production optimization and monitoring performance of producing well stock
Completion design
Artificial Lift Systems design, selection and optimization (Prosper, Rodstar, Qrod);
Improvement of Key Performance Indicators of production wells (ALS run life and MTBF)
ALS failure investigation and analysis
Preparation of Well Intervention/Workover programs
Stimulation planning (acidizing, fracturing).
Well testing (static and dynamic pressure survey, Pressure Buildup test, and fluid level measurements).
Workover and Well Intervention Planning.
Surface Production operation (Internal Pipeline Diagnostic).
Specifying consumables and spare parts stock levels necessary for the smooth fnctioning of production equipments.
Surface and downhole production equipment selection
Coordination and control of all type of production activities performed in the field;
To ensure that HSEQ system requirement are fully met and works performed accordingly;
To develop and implement HSEQ procedures and instructions according to RoK requirements;
Coordination and control of production and operation contractors and consultant services;
Participate in hiring process of production staff
Июль 2009 — Май 2010
11 месяцев
Petrom S.A (Member of OMV Group), "Tasbulat Oil Corporation" LLP
Актау
Production Supervisor
Providing un-interruptible performance of production facilities to achieve the production, treatment and shipment of on spec oil to customer.
Monitoring the oil production, oil treatment, disposal water and gas utilization.
Providing the monthly oil shipment according to GOST;
Providing the necessary actions to avoid the production losses
Assure the safe and healthy work condition for employers.
Assure the accurate running of equipments.
Coordinating of the foreman’s, operators and contractors performance.
Organizing and carry out duly planned procedures.
Carry out second stage of work condition control procedure
Assure the safety adherence and environment control requirements.
Periodical inspection of equipment performance, HVAC system performance, accuracy of protective equipments, auto control and alarm systems accuracy.
Assurance of surface production operation (Internal Pipeline Diagnostic and clean up).
Specifying consumables and spare parts stock levels necessary for the smooth functioning of production equipments.
Surface and downhole production equipment selection
To ensure that HSEQ system requirement are fully met and works performed accordingly;
To develop and implement HSEQ procedures and instructions according to RoK requirements
Сентябрь 2007 — Июль 2009
1 год 11 месяцев
Petrom S.A (Member of OMV Group), "Tasbulat Oil Corporation" LLP
Актау
Field Production Engineer
Natural flowing wells production and support for optimization opportunities
Inflow performance relationship, Well Flow performance – Well nodal analysis
Artificial lift system multi criteria selection and design/re-design for selected lift
Development and implementation of artificial lifts production optimization strategies (sucker rod pumps, electrical submersible pump systems)
Workover design and execution: proposal activities, program design
Well problem analyses and diagnostics, re-entry candidates proposals
Well production performance analysis and optimization
Central Process Facilities and gathering stations optimization
Well testing: Program design and Supervision
Well Flow Performance – Nodal analysis;
Water injection supervision and optimization
Interfacing with working interest partners, service companies and regulatory agencies
Works in many teams concerning reservoir evaluations, since 16 licensed reservoirs under Petrom properties
Production monitoring of naturally flowing wells and solving presence production problems (wax deposition, SKIN effect etc.)
Production monitoring and optimization of wells with artificial lift (sucker rod pumps, gas lift, progressing cavity pumps, electrical submersible pumps)
Well completion – re-completion technology: gives proposals
Artificial lift system selection and design: Sucker Rod pumping, Electrical Submersible Pumping
Preparing workover proposals and Supervising different types of workover job (the well selection) in line with the well evaluation objectives and workover program design
Декабрь 2002 — Сентябрь 2007
4 года 10 месяцев
Special Project -1 Training Framework, Agip KCO
Атырау
Control Room Supervisor
Was one of successors in a Special Project 1 announced by Agip KCO to prepare a qualified and trained personnel for North Caspian Project Kashagan. During all training courses visited for on-job training many ENI assets around the world such as: Novara, Italy - ENI Trecate Oil Center; Ebocha, Nigeria - ENI NAOC, Obiafu-Obrikom Gas Plant; Ravenna, Italy - ENI Power Plant; Venezia, Italy - ENI R&M Plant; Aksai, West Kazakhstan - Karachaganak Petroleum Operating; Zatchi oilfield, Congo - ENI Congo. The main target of mentioned trips was to get general overview of a process facilities, oil production upstream and downstream.
Обо мне
OS Windows 98/2003/XP, MS Office (Word, Excel, Power Point, Outlook, MS Project)
Petroleum Expert (Prosper, GAP)
PIMMS
Data Stream
RodStar, Q-Rod, Dynamogram, Echometer.
Высшее образование
2012
Юридический, Юриспруденция
2001
Нефтяной, Разработка и Эксплуатация Нефтяных и Газовых Месторождении
Знание языков
Гражданство, время в пути до работы
Гражданство: Казахстан
Разрешение на работу: Казахстан
Желательное время в пути до работы: Не имеет значения