Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas online more than two weeks ago
Candidate
Male, 42 years, born on 15 August 1982
Not looking for a job
Aktau, willing to relocate, prepared for business trips
The approximate area of the job search is specified
Project Quality Manager (PQM)
Specializations:
- Project manager
Employment: full time, project work
Work schedule: full day, shift schedule, flexible schedule, rotation based work
Work experience 19 years 4 months
January 2011 — currently
14 years 4 months
KCOI LLP (Rosetti Marino SPA branch)
Aktau, www.kcoi.kz
Construction, Real Estate, Architecture... Show more
Project Quality Manager (PQM)
Occupational Status – Project Quality Manager
Project – Offshore Separators Liquid Lines project.
Location – “Kashagan” oil field, Kazakhstan
Client – NCOC N.V.
Occupational Status – Project Quality Manager
Project – 30'' Amine vibrating line project.
Location – Eskene West Bolashak plant, Atyrau, Kazakhstan
Client – NCOC N.V.
Occupational Status – Project Quality Manager
Project – Fabrication of Wellhead Pipe Skids (62pcs.)
Location – Dunga oil field phase 3 project, Aktau, Kazakhstan
Client – Total E&P DUNGA GMBH
Occupational Status – Project Quality Manager
Project – Installation DBB at EPC2 Island.
Location – “Kashagan” oil field, Kazakhstan
Client – NCOC N.V.
Occupational Status – Project Quality Manager
Project – Provision of Pig Traps (10inches 2 pcs.)
Location – Aktau, Kazakhstan. KCOI yard
Client – KPO B.V.
Occupational Status – Punch List Coordinator
Project – 5 pcs. RIE’s Project (Remote Instrument Enclosures fabrication project)
Location – Aktau, Kazakhstan. KCOI yard
Client – Wood Group PNSK/TCO.
Occupational Status – QA/QC Coordinator
Project – Well Conversion Project.
Location – “Kashagan” oil field, Kazakhstan
Client – NCOC N.V.
Occupational Status – QA/QC Coordinator
Project – FGP / WPMP
Location – KCOI yard, Kazakhstan
Client – ERSAI
Occupational Status – QA/QC Coordinator
Project – Welding and Mechanical Call-offs
Location – complex D & Eskene West Bolashak, Kazakhstan
Client – PSN Kazstroy
Occupational Status – QA/QC Coordinator
Project – Hookup of Topside for EPC3 cluster
Location – EPC3 island, “Kashagan” oil field, Kazakhstan
Client – NCOC NV
Occupational Status – QA/QC Coordinator
Project – Provision of Modifications of the (2x28”, 4x20”, 2x6”) Existing Pig Launchers and Associated Facilities
OFFSHORE
Location – complex D, “Kashagan” oil field, Kazakhstan
Client – NCOC NV
Occupational Status – QA/QC Coordinator
Project – Welding Service for EPC-3
Location – Ersai Caspian Contractors Yard, Kazakhstan
Client – Ersai LLP
Occupational Status – QA/QC Coordinator
Project – FUTURE GROWTH PROJECT 10kV SUBSTATION
Location – Akshukur Yard, Kazakhstan
Client – SKEMA (TENGIZCHEVROIL)
Occupational Status – QC Inspector / Welding inspector
Project – Installation and Hook-up works of Producing (38pcs) & Water injection (5pcs) wells
Location – Dunga oil field, Aktau, Kazakhstan
Client – Maersk Oil Kazakhstan GmbH
Occupational Status – QC Inspector / Welding inspector
Project – Well clean up double basket strainer unit (10 pcs)
Location – Dunga oil field, Aktau, Kazakhstan
Client – Maersk Oil Kazakhstan GmbH
Occupational Status – QC Inspector / Welding inspector
Project – Sour Gas and Oil trunk line pipes reparation.
Location – Eskene West Bolashak plant, Atyrau, Kazakhstan
Client – Agip KCO
Occupational Status – QC Inspector
Project – Fabrication Metal structure workshop building & two floor office
Location - Akshukur Yard, Kazakhstan
Client – KCOI
Occupational Status – QC Inspector
Project – Fabrication & Assembly of launcher and Receiver Pig Trap Stations (#8 pcs.)
Location - Akshukur Yard, Kazakhstan
Client – Maersk Oil Kazakhstan GmbH
Occupational Status - QC Inspector
Project – Barge P1 accommodation Barge Temporary Refuge Upgrading
Location - Akshukur Yard, Kazakhstan
Client – Agip KCO
Occupational Status – QC Inspector
Project – Fabrication & Assembly of Pipelines Pig Trap Skid Packages (#8 pcs.)
Location - Akshukur Yard, Kazakhstan
Client - Agip KCO
Occupational Status – Civil Inspector
Project – Main buildings on Akshukur Yard (office, canteen, clinic, warehouse, works shops).
Location - Akshukur Yard, Kazakhstan
Client – KCOI
September 2008 — January 2011
2 years 5 months
Rosetti Kazakhstan LLP (Rosetti Marino SPA branch)
Aktau, www.rosetti.it/
Construction, Real Estate, Architecture... Show more
QC Inspector
ROSETTI Kazakhstan LLP
September 2008 – January 2011
Occupational Status - QC inspector
Project – Fabrication & Assembly of Infill Decks between barges B4&B6, B16&B18, B20&B16
Location – Ersai Caspian Contractors Yard, Kazakhstan
Client - Agip KCO
Occupational Status - QC inspector
Project – Fabrication & Assembly of Pipe Racks 11.4, 11.5, 11.5A, 11.6, 11.7
Location – Ersai Caspian Contractors Yard, Kazakhstan
Client - Agip KCO
May 2007 — September 2008
1 year 5 months
ISKER Consortium LLP
Atyrau, isker-group.com
Construction, Real Estate, Architecture... Show more
Project engineer
Project – Earthworks & Construction of concrete structures, foundations and paving
Location – Atyrau, Kazakhstan
Client - Agip KCO
• Method Statement for sub objects.
• Project Procedures.
• Material takeoffs MTO ( reinforcing bars, concrete, formwork, water stop materials, anchor bolts, insert plates, pipe-sleeves, cable-sleeves, lifting hooks, gratings & frames, precast and cast trenches etc.)
• Approval of Material Request Form and Material collection from Client.
• Control and tracking the TQ & CR
• Review Acceptance certificates of subcontractors.
• RoK required Project hand over documentation.
January 2006 — May 2007
1 year 5 months
Temir Beton NS LLP
Shymkent
Construction, Real Estate, Architecture... Show more
Project egineer
Project – Building of ten monolithic nine floor apartment houses
Location – Shymkent, Kazakhstan
Client - RoK
Making up schedules of works, Hand Over reports.
Skills
Skill proficiency levels
Driving experience
Driver's license category B
About me
COURSES & CERTIFICATES:
• CSWIP 3.1 - Welding Inspector - CSWIP Cert. # 257826 (Candidate Number 659174 valid until 23.12.2021 TWI UK);
• Level II order 309 Welding specialist (Kazakhstan Regulation) Cert. #005 (valid until 26.04.2022)
• Auditor GOST ISO/IEC 17025-2019 General rules for Calibration Laboratories Cert. #1460-2021
• Auditor ISO 19011-2019 Guidelines for auditing management systems Cert. #1460-2021
OTHER SKILLS:
Project required Plans and Procedures issuance, Project measuring equipment control, Material receiving and handling, Material certification and traceability, Piping (High / Low pressure) and steelworks fabrication, PWHT, NDT, Test pack preparation and test execution (Leak, Hydro, Pneumatic), Release for coating, Flange management, Mechanical completion, Pre-commissioning, Handover documentation to client.
Higher education
2005
National South Kazakhstan University
Oil and Gas, Extraction and Oil refining.
Languages
Citizenship, travel time to work
Citizenship: Kazakhstan, Russia
Permission to work: Kazakhstan, Russia
Desired travel time to work: Doesn't matter