Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas online yesterday at 21:33
Candidate
Male, 31 year, born on 6 March 1994
Actively searching for a job
Astana, willing to relocate (Aktau, Almaty, Astana, Atyrau), prepared for business trips
Project Engineer / E&I Engineer
Specializations:
- Other
Employment: full time, project work
Work schedule: full day, shift schedule, flexible schedule, remote working, rotation based work
Work experience 8 years 1 month
January 2024 — currently
1 year 4 months
TengizChevroil LLP
System Owner - Pressure Boost Facility
Oversaw the Pressure Boost Facility (PBF) Train 1-2, ASD System, ASD Chiller Package, Air Compressors, and the Instrument Air System of the plant, ensuring their safe and efficient operation.
Developed comprehensive short-term (2/4 weeks) and long-term plans for Commissioning works, collaborating with the Discipline Team to ensure smooth execution.
Coordinated with the Construction team to facilitate the safe and timely handover of areas according to the plan, minimizing disruptions and ensuring seamless integration.
Supervised the SC Discipline team and Contractors, providing guidance and support to ensure the completion of Commissioning work as per plan and in a safe manner.
Regularly reported the status of ongoing works to the SC Manager and Operations team, ensuring transparency and effective communication.
Optimized costs by strategically managing vendor arrivals to the site and efficiently allocating Construction & SC Contractors manpower.
Ensured the safe completion of Commissioning activities and StartUp, adhering to all safety protocols and industry standards.
Collaborated with the Operations team to facilitate the safe handover of the facility, ensuring a seamless transition from Commissioning to Operations.
July 2023 — January 2024
7 months
TengizChevroil LLP
SC Commissioning Project Engineer (FGP project)
Assisted the Commissioning team in developing comprehensive work strategies, including Motor Solo run, Load run, Leak tests, and Lube Oil Flushing, ensuring smooth and efficient execution of the FGP project at Tengizchevroil.
Proactively forecasted material requirements for Machines and Compressors, placing orders in advance to prevent any material-related issues and minimize downtime.
Collaborated closely with the Construction & Systems Completion team to develop detailed plans, addressing potential issues and ensuring seamless coordination for upcoming works.
Worked closely with Discipline team, System Owners, and Leads to identify and resolve any issues preventing Machine/Compressor operation, ensuring a smooth transition to the next phase of the project.
Conducted thorough analysis of work progress, including Construction completion, Systems Completion, Walkdowns, and Handover to Ops, preparing reports that highlighted schedule adherence and identified problem areas.
Maintained clear and concise communication with stakeholders, ensuring a shared understanding of project status and any potential challenges.
Consistently followed industry best practices and maintained accurate documentation, facilitating knowledge transfer and ensuring compliance with project requirements.
Diligently proofread all reports and documentation, ensuring accuracy and professionalism in all communications.
January 2022 — July 2023
1 year 7 months
Tengizchevroil LLP
Atyrau, www.tengizchevroil.com
FF WPMP Site Owner (FGP project)
Directed and managed all pre-commissioning and commissioning scopes of brownfield areas (MS 21, 24, 26, MLVS-23), demonstrating strong leadership and management skills.
Developed and executed 3-week and 6-week ahead plans, as well as long-term and short-term plans for site commissioning scopes, ensuring efficient planning and execution.
Managed and optimized costs for Systems Completion works for assigned Metering Stations in brownfield areas, resulting in cost savings and timely completion of projects.
Collaborated with Construction Management to ensure their scope completion within deadlines and timely handover of the area and subsystems, facilitating smooth project progress.
Maintained a strong interface with the Operations Team for safe and planned handover of area/subsystems without disrupting existing plant operations, ensuring operational continuity.
Oversaw the control of SC and Construction permits to prevent incidents, such as construction team members getting shocked by energized equipment, prioritizing safety.
Managed areas to prevent SimOps activities with Construction, other Projects, and BB Operations, ensuring a safe and efficient work environment.
Accountable for the completion of site works as per the plan and coordinated with suppliers and subcontractors throughout the on-site commissioning process, ensuring timely completion.
Coordinated with all Discipline Leads/Supervisors (Electrical, I&C, Mechanical) to drive Commissioning activities effectively, fostering collaboration and coordination.
Regularly attended commissioning meetings with client's engineering and operational teams, providing valuable input and updates, and provided daily/weekly/bi-weekly reports to the SC Manager/Operations, ensuring effective communication and reporting.
December 2020 — January 2022
1 year 2 months
Tengizchevroil LLP
Atyrau, www.tengizchevroil.com
E&I Engineer (FGP FF Systems Completion)
Conducted pre and final walkdowns to ensure proper installation of all electrical and instrument devices, cables, and equipment, documenting any deviations or incorrect installations.
Assisted the E&I team in planning and preparing all commissioning documentation, including CTPs, ensuring smooth and efficient commissioning processes.
Reviewed and analyzed required electrical, instruments P&ID, single line, ISO, DSW, CBD drawings, providing valuable feedback and redlines for handover to the operations team.
Possess detailed technical understanding and practical knowledge of MV, LV induction, and synchronous motors/generators, ensuring accurate and efficient troubleshooting and maintenance.
Coordinated and controlled contractors, assigning them daily tasks based on the commissioning plan, ensuring timely completion of projects.
Collaborated with the operations team to plan and align daily commissioning work, minimizing tripping and activating alarms, ensuring smooth operations.
Supported the E&I discipline team in planning energization works on major equipment, ensuring safety and efficiency in the energization process.
Maintained clear and effective communication with team members and stakeholders, ensuring smooth coordination and alignment of activities.
October 2018 — December 2020
2 years 3 months
Kentech Group
Atyrau
E&I Commissioning Coordinator (FGP FF Systems Completion)
Coordinated pre-commissioning and commissioning activities for LV, MV, and energization works as the E&I Commissioning Coordinator.
Ensured the successful completion of systems and equipment, adhering to project timelines and quality standards.
Collaborated with cross-functional teams to identify and resolve any issues or challenges during the commissioning process.
Conducted thorough inspections and tests to verify the functionality and safety of electrical and instrumentation systems.
Developed and implemented commissioning plans and procedures, ensuring efficient and effective execution.
Provided technical expertise and guidance to team members, promoting a high level of performance and productivity.
Maintained accurate documentation and records of commissioning activities, ensuring compliance with regulatory requirements.
Demonstrated strong attention to detail and adherence to safety protocols throughout the commissioning process.
December 2017 — August 2018
9 months
Future GMBH & Co. Kg
Germany, www.futuregmbh.eu
Power Industry... Show more
Electrical Technician (Construction, Solar Energy Project)
To install configures, installs, inspects, and maintains solar PV systems for customers.
Create and make changes on electrical single line diagram, string diagram & plant layout for solar electric system
Installation of solar system as per safety standards and procedure and handover to Operations. Conduct submission of solar plant handover documents to clients after final inspection and review of site.
Execute plans of electrical wiring for solar batteries and other electrical systems
Connect wiring in electrical circuits and networks ensuring compatibility of components
To assess the environment, and detect and mitigate any hazards associated with installation.
To seal the system against weather, using safety codes and manufacturer specifications.
To test the system and measure grounding systems and make any adjustments to the controls
March 2017 — December 2017
10 months
Astana International Airport named after NAN
Astana, www.astanaairport.kz
Transportation, Logistics, Warehousing, International Logistics... Show more
Technical Specialist
Maintenance of examination equipment (Rapiscan)
Skills
Skill proficiency levels
Driving experience
Own car
Driver's license category B, CHigher education (bachelor)
2016
Guilin University of Technology
Chinese Language, Chinese Language
2014
Al-Farabi Kazakh National University, Almaty
radioengineering, Radio Engineering
Languages
Tests, examinations
2023
EX Inspection and Auditing
Edil-Oral.kz LLP, E&I EX Inspection
Citizenship, travel time to work
Citizenship: Kazakhstan
Permission to work: Kazakhstan
Desired travel time to work: Doesn't matter