Больше информации по резюме будет доступно после регистрации

Зарегистрироваться

Кандидат

Мужчина, 52 года, родился 19 января 1973

Польша, готов к переезду (Актау, Алматы, Астана, Атырау), не готов к командировкам

Senior Finance Specialist/ Senior Controller/ Project Controller

Специализации:
  • Финансовый контролер
  • Финансовый менеджер

Занятость: полная занятость

График работы: полный день

Опыт работы 25 лет

Январь 2013по настоящее время
12 лет 3 месяца
ILF Consulting Engineers Polska Sp. z o.o.

Польша, www.ilf.com

Строительство, недвижимость, эксплуатация, проектирование... Показать еще

Senior Finance Specialist/ Controller/ Project Controller
Financial and control activities for over 30 ongoing projects in areas of oil &gas, energy & climat protection, transport & structures. Scope of works: budgeting, cash flow, invoicing, checking and approval of incoming invoices, bank payments, controlling, reporting, auditing. Main projects: Doha South WWTP & Pumping Station; Pre-Bid Engineering, Jaworzno III 910 MWe Power Unit – design, Consulting Services for incineration plant in Poznań, Poland Owner’s Engineer for supercritical coal fired 1075 MWe power unit Kozienice Poland, Combined cycle power plant Stalowa Wola Poland, Owner’s Engineer Trans Nigeria Gas Pipeline Project (1200 km long new pipeline system from Calabar to Ajakouta, Kano and Kaduna including several intake, offtake and compressor stations) Tasiast Raw Water Pipeline, Mauritanie (steel pipeline, length: 150 km, diameter: 40", capacity: 99,000 m³/day, 1 pumping station) Gas Storage Jemgum - Stage II, Germany (Construction of new compressortrain, 320000 m³/h) LNG Terminal in Ukraine (Pre-project, exploration works and adjustments of feasibility study for construction of LNG terminal in Ukraine
Март 2012Октябрь 2013
1 год 8 месяцев
ILF Kazakhstan Engineering and Project Management, LLP

Атырау

Finance and Administration Specialist
Kazakstan Pipeline Venture Project Management and Consultancy Team - Atyrau branch for the Expansion and Upgrading of the existing Oil pipeline between Tengiz and Novorossisk – Kazakhstan section. Main responsibilities: coordination of finance, staff, administrational & IT issues; pay roll, cost control, preparation/updating rotation schedule, management of company accommodation resources.
Апрель 2000Февраль 2012
11 лет 11 месяцев
ILF Consulting Engineers Polska Sp. z o.o.

Польша, www.ilf.com

Senior Financial Specialist at Financial Controlling Team Finances & Administration Department
Main tasks 1. Project audit 2. Invoicing Preparation of invoices. Providing support for project managers. Performing ongoing control of all services checking whether all services are invoiced according to payment plan. Analysis of arrears in billing 3. Internal administrative project preparation 3.1. Obtaining of bank guarantees per project 3.2. Project budget, calculation sheet per project 4. Intercompany accounting with other ILF companies 5. Intercompany billing 6. Reporting 6.1. Participating in preparation of commercial report 6.2. Participating in preparation of cash flow 7. Cooperation with outsourcing company in scope of financial matters 8. Pay desk & bank payments Main projects: Baku-Tbilisi-Ceyhan (BTC) Crude Oil Pipeline - Turkish Section (total length: 1,750 km, length of turkish section: 1,070 km, diameter: 46", 42", 34", design capacity: 50 Mt/a, 4 pump stations (90 MW), 1 pressure control station, terminal at Ceyhan with tank farm (7 x 150,000 m³) and jetty for 2 x 300,000 DWT tankers) El Khoms - Tripoli Gas Pipeline, Libya (Installation of new gas pipeline from El Khoms to Tripoli in Libya with compressor station, Length: 157 km, diameter: 34") Melita - Tripoli Gas Pipeline, Libya (Installation of new gas pipelines from Melita to Tripoli pipeline - length: 98 km, diameter: 34" and from El Khoms to Tripoli with compressor stations Gas Storage in Aqaba Phase I and II, Jordan Transport of natural gas from Egypt to Jordan. Erection of 3rd and 4th turbocompressor trains in order to respond to future transport capacity increase needs. Preparation and Compression of Associated Gas, Co-generation Plant on the Oil Rig "Baltic Beta" Wladyslawowo(Utilization of associated gas by preparation, compression and firing in a co-generation plant for electric power and steam production. 4-stage compression of associated gas - flow: 100.000 Nm³/day, discharge pressure: 130 bar, co-generation unit - electric power: 3.5 MW, steam production: 5.0 t/h) Underground in Warsaw Second line, Poland Czestochowa combined heat and power plant, Poland Warsaw Int'l Airport, Poland

Обо мне

During 18 years of employment I have gained extensive and diverse experience in Finance and Administration on multi-million dollar international projects in Oil & Gas, Energy, Transport, Water & Environment industries. Enthusiastic, ambitious, highly motivated, results-oriented, hard working, positive results oriented. Good verbal / written communication skills. Works well under pressure either as a part of a team or individually. Able to access and analyze a situation quickly and take decisions. Has a positive and pro-active commitment to HSE through the personal application of safety critical behaviour. I am accustomed to working long unsociable hours and can guarantee my complete commitment to the success of the Project.

Высшее образование (Магистр)

2004
Warsaw School of Economics, Poland
Finance, Postmaster Study in Finance
1999
High School of Commerce and Law, Poland
Finance, M.S c. of Economy
1999
University of Vienna, Austria
Humanitarian Science, Knowledge of German language, level V
1994
Business College, Warsaw Poland
Economics, Economist

Знание языков

ПольскийРодной


АнглийскийC1 — Продвинутый


НемецкийC1 — Продвинутый


РусскийC1 — Продвинутый


Гражданство, время в пути до работы

Гражданство: Польша

Разрешение на работу: Казахстан

Желательное время в пути до работы: Не имеет значения