Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was online today at 03:23

Candidate

Male, 37 years, born on 11 July 1987

Actively searching for a job

Astana, willing to relocate (Australia, Azerbaijan, Aktau, Aktobe, Almaty, Astana, Atyrau, Great Britain, Germany, Egypt, Indonesia, Canada, Karaganda, Qatar, Cyprus, China, Kingdom of Saudi Arabia, Kuwait, Malaysia, Netherlands, New Zealand, Norway, UAE, Oman, Pavlodar, USA, Singapore, Turkey, Scotland), prepared for business trips

Project Engineer

Specializations:
  • Other

Employment: full time, project work

Work schedule: full day, shift schedule, flexible schedule, remote working, rotation based work

Work experience 14 years 7 months

September 2023currently
1 year 7 months
TENGIZCHEVROIL

Atyrau

EARLY PHASE LEAD PROJECT ENGINEER
• Directed cross-functional teams in the evaluation and analysis of potential projects and strategic initiatives. • Led the team as a Scrum Master to develop early-stage project concepts ensuring adherence to Agile principles. • Prepared detailed business cases aligning project goals with stakeholder expectations. • Championed Agile Transformation across the organization while coaching teams, leaders, and stakeholders. • Contributed for the Integrated Business Planning cycle ensuring strategic investment alignment and maximizing economic returns.
October 2020August 2023
2 years 11 months
TENGIZCHEVROIL
TURNAROUND PROJECT LEAD
• Led the planning and execution of recurring turnarounds for the High Pressure to Low Pressure Conversion Project in Tengiz & Korolev oil fields. • Developed detailed turnaround integrated schedules and coordinated execution plans with various departments. • Facilitated Risk Review Workshops to identify potential risks and develop mitigation strategies. • Established KPIs, metrics, and performance targets in Salesforce to track progress and measure success.
November 2018September 2020
1 year 11 months
CHEVRON REFINERY
MECHANICAL PROJECT ENGINEER
• Supported refinery Operations and Maintenance by providing engineering solutions, minimizing refinery downtime, and maximizing operational efficiency. • Developed comprehensive Engineering Work Order packages, Data Sheets, and Material Take-offs for routine and turnaround jobs. • Conducted engineering calculations and analyzes to ensure designs meet performance and safety requirements.
March 2016October 2018
2 years 8 months
TENGIZCHEVROIL

Oil and Gas... Show more

PROJECT ENGINEER
• Managed small/mid-sized capital projects throughout all phases from pre-FEED to closeout. • Developed and implemented comprehensive project documentation such as Decision Support Packages, Project Framing Documents, and Execution Plans. • Updated and maintained project Risk Registers, Lessons Learned and Decision Logs, and Document Distribution Matrices. • Conducted technical and commercial bid evaluations for engineering, construction services, and procurement. • Ensured compliance with HSE regulations and promoted a culture of safety within the project team.
December 2013February 2016
2 years 3 months
TENGIZCHEVROIL
MECHANICAL PROJECT ENGINEER
• Provided Mechanical Engineering support for gas plant Operations and Maintenance by providing engineering solutions, minimizing plant downtime, and maximizing operational efficiency. • Created and reviewed general arrangement, isometric drawings, and piping and instrumentation diagrams, ensuring accuracy and compliance with local and international industry standards (ASME, API, ASTM, GOST). • Developed comprehensive Engineering Job Packs, Data Sheets, and Material Take-offs for routine and turnaround jobs.
July 2011November 2013
2 years 5 months
TENGIZCHEVROIL
CONSTRUCTION ENGINEER
• Led the planning and execution of multidiscipline projects, ensuring they are completed on time and within budget, and to the highest quality standards. • Facilitated project workshops, including Risk Analysis, Safety in Design, and Constructability Reviews, promoting a proactive approach to risk management and safety. • Conducted post-project reviews to capture lessons learned, drive continuous improvement, and enhance future project performance. • Fostered a strong safety culture during project execution, ensuring all team members adhered to safety protocols and best practices, resulting in a safe and efficient work environment.
January 2011June 2011
6 months
SEMBOL CONSTRUCTION
SITE CONSTRUCTION ENGINEER
• Supported the Construction Manager in supervisory duties, including engagement with architects, engineers, surveyors, and contractors, ensuring seamless on-site coordination. • Facilitated daily meetings with contractors, prioritizing work and tracking progress. • Promoted and enforced a strong safety culture during project execution.
September 2010December 2010
4 months
ALSIM ALARKO SANAYI TESISLERI VE TlCARET A.S.
LOGISTICS ENGINEER
• Facilitated seamless communication between the warehouse and construction teams. • Managed the flow of goods and services both within and outside the company.

Skills

Skill proficiency levels
Advanced level
Leadership Skills
Presentation skills
MS PowerPoint
Project management
Teamleading
Управление проектами
Agile Project Management
Project Documentation
Engineering
Facilitation Skills
Preparing Presentations
Scrum
Conflict management
Team management
Oil And Gas
Business Planning
Capex
Interpersonal skills
Reporting
Medium level
Pipeline
Portfolio
Risk management
Cost Management

Driving experience

Own car

Driver's license category B

Higher education (master)

2020
UNIVERSITY OF NORTH ALABAMA
BUSINESS, MASTER OR BUSINESS ADMINISTRATION (MBA)
2010
SYRACUSE UNIVERSITY
CIVIL AND ENVIRONMENTAL ENGINEERING, B.S. IN CIVIL ENGINEERING

Languages

KazakhNative


EnglishC2 — Proficiency


RussianC2 — Proficiency


TurkishC2 — Proficiency


Citizenship, travel time to work

Citizenship: Kazakhstan

Permission to work: Kazakhstan

Desired travel time to work: Doesn't matter