Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas online more than a week ago
Candidate
Male, 36 years, born on 12 July 1988
Not looking for a job
Aktau, willing to relocate, prepared for business trips
The approximate area of the job search is specified
Project Engineer
1 000 000 ₸ in hand
Specializations:
- Other
Employment: full time
Work schedule: full day, shift schedule, rotation based work
Work experience 15 years 10 months
May 2024 — currently
11 months
Sewon Vertex Heavy Industry LLP
Aktau, www.sewon.kz/
Project Engineer
Projects scheduling/planning for Pre-bid and Post-bid projects and material follow-up.
Scheduling/Follow up the project from design/QC documents submission & approval from Client for the clearance/raw material ordering/Sub vendor plan/Fabrication
manpower/Consumables/Manufacturing till the job will reach the site.
Liaise & expedite with supplier or sub-contractor for material/fabrication follow-up. Minutes of Meeting with supplier/sub-contractor via con-call / directly visit their place whenever needed.
Prepare/follow-up for planned inspection notification & inspection look ahead schedule.
Conduct Kick off Meeting (KOM) & Pre-Inspection Meeting (PIM) with Client.
Refer general standards/specifications and Material/Purchase specifications for each and every projects and monitor whether fully complied with specs.
Documentation and control for ISO and conducting internal audits.
Record delays and rectify them in subsequent projects.
Monitor daily log sheet for fabrication process.
Monitor rework register to rectify the repeated reworks for upcoming projects.
Prepare the monthly dispatch schedule and Actual vs Target monthly dispatch file.
February 2022 — April 2024
2 years 3 months
KENT KAZAKHSTAN (ТОО ККТС)
kentplc.com/contact-us/kazakhstan
PTW Area Controller
Ensure procedures and processes are clearly communicated to all work groups.
Capable of delivering process orientation and awareness to users.
Provides support to and actively participates in Save Your Life Actions (SYLA) and IIF Programs
Participates in Safety Meetings.
Coach and mentor PTW staff to ensure a consistent application of the Electrical process is applied
Understands PTW safety instruction philosophy of work activity categorization and can assist work groups with PTW preparations.
Understands the safety instruction requirements of a Planning Phase Hazard Analysis (PPHA) and Job Safety Analysis (JSA).
Establish strong alliance and interface with FGP Construction, System Completion, Operations & HES Team as a primary focal contact for PTW.
Regular inspection of worksites ensuring tasks are undertaken in safe man
July 2019 — January 2022
2 years 7 months
Sewon Vertex Heavy Industry LLP
Kazakhstan, www.sewon.kz/
Project Engineer
Projects scheduling/planning for Pre-bid and Post-bid projects and material follow-up.
Scheduling/Follow up the project from design/QC documents submission & approval from Client for the clearance/raw material ordering/Sub vendor plan/Fabrication
manpower/Consumables/Manufacturing till the job will reach the site.
Liaise & expedite with supplier or sub-contractor for material/fabrication follow-up. Minutes of Meeting with supplier/sub-contractor via con-call / directly visit their place whenever needed.
Prepare/follow-up for planned inspection notification & inspection look ahead schedule.
Conduct Kick off Meeting (KOM) & Pre-Inspection Meeting (PIM) with Client.
Refer general standards/specifications and Material/Purchase specifications for each and every projects and monitor whether fully complied with specs.
Documentation and control for ISO and conducting internal audits.
Record delays and rectify them in subsequent projects.
Monitor daily log sheet for fabrication process.
Monitor rework register to rectify the repeated reworks for upcoming projects.
Prepare the monthly dispatch schedule and Actual vs Target monthly dispatch file.
July 2018 — July 2019
1 year 1 month
Ersai Caspian Contractors LLP
Kazakhstan, www.ersai.kz/
E&I Supervisor
Project: TCO Future Growth Project
Supervise and manage sub-contractor personal
Work closely with other disciplines (Scaffolding, Insulation, Lifting, Structural, Piping)
Work closely with Engineering
SQ/TQ submit if necessary
Request material as following MTO
Instruments, devices installation
Cable Tray Installation
Cable Installation
Lighting
Heat tracing for the pipe lines
Cable management as per project requirement
Electrical Equipment Installation in Hazardous Area (EX-
PROOF)
Electrical Completion (EC)
January 2016 — July 2018
2 years 7 months
Caspian Offshore and Marine Construction LLP
Kazakhstan, www.comc.kz/ru
Heavy Engineering... Show more
Maintenance Superintendent
Project: SRU Atyrau prefabrication, ISKER Orken prefabrication, Wagenborg barge modification
Plan and undertake the preventive maintenance on all facilities and equipment’s of the yard. Liaises with Production Manager, other discipline superintendents, procurement or any members of higher management to ensure that all facilities and equipment’s of the Yard are maintained in top condition all support is available to keep the project on schedule and under assigned budget.
Ensures adherence to the site Quality Control Program in his related scope of assignment.
Responsible for requisitioning material, equipment and tools purchase (for responsible area)
Keep record of all machines and consumables consumption usage for facilities and project for internal and external auditing purpose.
Summary Yard Equipment’s (Transformer substation, Gantry cranes, Diesel Generators, Transporters, Crawler cranes, Forklift, CNC plate cutting, Welding machines…)
July 2014 — January 2016
1 year 7 months
Caspian Offshore and Marine Construction LLP
Kazakhstan, www.comc.kz/ru
Commissioning Engineer
Project: Bilding of Jack-Up Rig from KMG "SATTI" (JUDR M411)
E&I Commissioning
Collection of acceptance reports related to each system (EC/MC completion)
Preform Loop Check & Insulation test for system cable.
Pre-operational performants (Works permit, Energizing permit, lock/out tag/out system)
Perform Pre-Commissioning
Perform Official Commissioning with Client and Class representative attendance (ABS)
Work deeply with vendor documentation and make correspondence with factory if required.
Work closely with other commissioning discipline (mechanical, piping) during megure activities.
January 2014 — July 2014
7 months
Keppel Kazakhstan LLP
Kazakhstan
Assistant Commissioning Engineer
Project: Bilding of Jack-Up Rig from KMG "SATTI" (JUDR M411)
E&I Commissioning
January 2013 — January 2014
1 year 1 month
«Keppel FELS Ltd» Singapore
Singapore, www.keppelom.com/en/
Engineer
Project: B338 Bilding Jack-up Drilling Rig "La Covandonga" (CP Latina)
Project: B339 Bilding Jack-up Drilling Rig "Arabdrill60" (Arabian Drilling Company)
June 2009 — December 2012
3 years 7 months
Keppel Kazakhstan LLP
Kazakhstan
Draftsman
Project: Pipe Racks for D Island (Agip KCO)
Skills
Skill proficiency levels
Driving experience
Own car
Driver's license category BHigher education (bachelor)
2017
Каспийский Государственный Университет Технологий и Инжиниринга им. Ш.Есенова
Нефте Газовое дело, БНГС
2012
Каспийский Государственный Университет Технологий и Инжиниринга им. Ш.Есенова
Электроэнергетика, 050718-Электроэнергетика
Languages
Citizenship, travel time to work
Citizenship: Kazakhstan
Permission to work: Kazakhstan
Desired travel time to work: Doesn't matter