Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas online today at 18:09
Candidate
Male, 32 years, born on 11 November 1992
Actively searching for a job
Taraz, willing to relocate (Aksay (Kazakhstan), Aktau, Almaty, Atyrau, Shymkent), prepared for business trips
Mechanical / Piping Engineer
Specializations:
- Other
Employment: full time, project work
Work schedule: rotation based work
Work experience 6 years 7 months
February 2024 — June 2024
5 months
Neftestroiservice
Mechanical engineer
- Gained familiarity with the project scope of work, specifications, schedule, and all inter-discipline requirements, including identifying concerns as early as practicable - Prepared marked up drawings for mechanical and electrical isolation on construction site
- Visited construction site regularly to identify and address engineering issues
- Prepared technical queries when requested by construction team
- Prepared redlines and As-built for piping isometric drawings
- Provided engineering support as required
- Prioritized and organized own work to meet deadlines
June 2021 — March 2023
1 year 10 months
VELESSTROY
Atyrau
Construction, Real Estate, Architecture... Show more
Piping/Mechanical Construction Engineer
Project: 3GI ME&I (Third Generation Sour Gas Injection Unit)
Client: «TengizChevroil»
Construction Department:
• Managed and oversaw valve testing, calibration, and installation, ensuring compliance with agreed MC timelines. Identified and resolved engineering challenges during the installation process, ensuring timely completion of project
• Coordinated technical certification for Vessels, Tanks, and Filters, overseeing final box-up inspections to maintain adherence to schedules
• Collaborated closely with construction supervisors to effectively plan and monitor daily site activities, ensuring efficient crew management and task execution
• Organized and conducted quality inspections with the construction team, gathering and submitting necessary documents and reports for timely NFI (Notification for Inspection) submissions.
• Successfully addressed and closed Punch list items following sub-system and SID walkdowns, maintaining project quality standards
• Provided comprehensive technical support to the Construction department and MC team, ensuring the timely delivery of sub-systems and adherence to project specifications
October 2019 — May 2021
1 year 8 months
VELESSTROY
Atyrau
Construction, Real Estate, Architecture... Show more
Project Production Control Engineer
Project: 3GI ME&I (Third Generation Sour Gas Injection Unit)
Client: «TengizChevroil»
Project Production Control Department:
• Conducted daily site visits to assess work progress and gather relevant information
• Developed and implemented daily Production Plans, ensuring optimal resource allocation
• Monitored and updated the current Production Plan, identifying and addressing causes for any deviations
• Facilitated Daily and Weekly Production Planning sessions to streamline project execution
• Developed and disseminated a detailed 4 Week Look Ahead Production Schedule, outlining tasks at a granular level to enhance project management
• Established strong collaborative ties with Workface Planning, Project Controls, PLMM, Construction, and Engineering departments, along with Client and Sub-Contractors, to ensure cohesive project management
May 2018 — October 2019
1 year 6 months
ERSAI Caspian Contractor
Aktau
Construction, Real Estate, Architecture... Show more
Mechanical / Piping Field Engineer
Project: FGP/WPMP Pre-Assembled Pipe Rack Modules Fabrication & Erection
Client: «TengizChevroil»
Fabrication Department:
• Conducted meticulous Line checks against Piping Isometric drawings, enabling the release of lines for pre-hydro walkdowns
• Managed Reinstatement activities and closure of pre-hydro walkdown Punch lists after hydro testing, handing over test packs to the Mechanical completion team
• Proactively coordinated with Sub-contractors for Closure Weld cutting, beveling activities, remachining damaged flange faces, and borescope inspections, ensuring timely rectification of any defects
• Promptly reviewed and closed Punch lists raised by the Client during SID Walkdowns, maintaining adherence to project quality standards
• Acted as an interface between Piping, Structural, E&I Construction groups on site, and the Engineering, MC, and QC departments
February 2017 — May 2018
1 year 4 months
Sicim S.p.A Kazakhstan
Atyrau
Construction, Real Estate, Architecture... Show more
Junior Piping/Mechanical Engineer
Project: KTL Seasonal Gap Reduction (SGR), Second Generation Plant Enhancement (SGE)
Client: «TengizChevroil»
Technical Department:
• Conducted regular plant visits to identify and address engineering issues, preparing Site Engineering Queries as needed
• Performed thorough site checking of piping isometrics and structural drawings to ensure the accuracy of As-Built documentation
• Expertly prepared and managed Material Requisition requests to ensure timely procurement of necessary materials
• Provided technical support to the Construction department
Skills
Skill proficiency levels
Driving experience
Driver's license category B
Higher education (bachelor)
2016
Kazakh National Research Technical University named after K. Satbayev
Petroleum Engineering, Design, construction and operation of oil & gas pipelines and storages
2012
Kazakh-Turkish College of economics
Economics, Marketing
Languages
Citizenship, travel time to work
Citizenship: Kazakhstan
Permission to work: Kazakhstan
Desired travel time to work: Doesn't matter