Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas less than a week ago
Candidate
Male, 32 years, born on 16 July 1993
Considers offers
Aktau, willing to relocate, prepared for business trips
QA/QC Engineer
Specializations:
- Other
Employment: full time, project work
Work schedule: full day, rotation based work
Work experience 10 years 1 month
September 2025 — currently
4 months
Almaty
FMCG (non-edible)... Show more
QA Engineer
Development, updating, and implementation of Quality Control Plans (QCP), Inspection & Test Plans (ITP), procedures, and inspection methodologies in accordance with EPC project requirements.
Planning, conducting, and documenting internal Quality Management System audits (ISO 9001:2015); preparation of audit reports, corrective actions, and evaluation of QMS effectiveness.
Performing audits of subcontractors and suppliers, assessing quality risks, and ensuring compliance with contractual and regulatory requirements.
Development, coordination, and monitoring of corrective and preventive actions.
Analysis of process performance, maintenance of quality KPIs, and preparation of regular reports for management and PMC.
Registration of NCR/OBS, performing Root Cause Analysis using industry-standard methods.
Monitoring and training personnel on quality procedures, conducting training sessions and briefings.
Development of checklists, control forms, inspection matrices, and standards for contractors.
Monitoring compliance of construction and installation works with project documentation, safety regulations, and quality standards.
Coordination and communication with the EPC contractor, PMC, client, inspection authorities, and subcontractors.
Participation in technical meetings, documentation reviews, and resolution of quality-related issues within the project.
Identification and assessment of quality risks, participation in development of risk mitigation plans.
Support of continuous improvement initiatives and implementation of best quality practices within the project.
June 2022 — August 2025
3 years 3 months
KCOI (Kazakhstan Caspian Offshore Industries)
Aktau, kcoi.kz
Industrial Equipment, Machine Tools and Components... Show more
NDT Laboratory QA Engineer
Responsible laboratory of non-destructive testing accredited according to GOST ISO/IEC 17025 for the development, implementation and improvement of QMS, QMS documentation management, documentation updating, internal audit, external audit by the RSE NCA, organization of equipment inspection and certification of test equipment, updating of regulatory documents. Responsible for accreditation at the National Accreditation Center (NCA).
The testing laboratory actively participated in the reaccreditation process, successfully passed all required assessments, and received official confirmation of compliance with established standards, thereby extending its accreditation for an additional five years.
April 2021 — May 2022
1 year 2 months
Saren B.V (Saipem S.p.a & Renaissance Heavy Industries Venture)
Mezhdurechye (Murmansk Region), saipem.com,https://ronesans.com
Heavy Engineering... Show more
Quality Assurance and Control Supervisor
Responsible for the development, implementation, and continuous improvement of the Project Quality Management System (QMS) within the Arctic LNG 2 project.
Supported the Project Quality Manager and Quality Engineer in implementing procedures, work instructions, KPI targets, customer satisfaction initiatives, and management reviews.
Prepared, analyzed, and updated the Project Quality Control Plan (QCP), including inspection/test plans, quality procedures, and relevant templates and forms.
Conducted supplier/subcontractor quality system evaluations and audits to ensure compliance with project requirements.
Monitored and controlled non-conformities, performed root cause analyses, and followed up on corrective actions.
Conducted internal and external quality audits in accordance with project and company standards.
Organized and delivered internal technical trainings on quality-related topics.
Support for the creation of analysis by the management of PQM.
November 2019 — April 2021
1 year 6 months
Saren B.V (Saipem S.p.a & Renaissance Heavy Industries Venture)
Mezhdurechye (Murmansk Region), www.saipem.com,https://ronesans.com
Heavy Engineering... Show more
Senior QA/QC Inspector
Collection of reports on daily basis from respective methods of NDT lab.
Ensuring reports liability towards clerical errors and technical errors.
Rising nonconformity against reports imperfection and fault and take necessary actions.
Control and monitor client approval process and document submission to the client.
Controlling/assisting in workflow management and document distribution.
Assisting the direct Supervisor/Coordinator in all activities relevant to the proper filling and traceability of all QA/QC documents and records.
Preparing QA/QC dossiers to satisfy milestone target dates.
Assuring the entire documents of client approval and trace nonconformity on reports.
Updating signed documents in web-based document sharing tool – Sharepoint.
Preparation of QA/QC documents and maintain track record of every process
Preparation of written reports documenting surveillance activities.
Issuing Non-conformance Reports (NCRs) to the Project for disposition. Assist providing solutions.
Issuing inspection (surveillance) reports, non-conformance reports and inspection (surveillance) release reports to appropriate project personnel and coordinates the disposition of nonconformities.
Supervision of Civil work and other mechanical work, inspection of incoming control under the control of the register. Every separately
Сhecking all types of discipline according to QCP and ITP according to the section each QC code corresponding to the form
Checking reports on Civil work, Mechanical outfitting, Painting / Coating and Post Tension according to QCP and ITP.
Checking all documentation from construction drawings according to latest revision and if have deviation sending drawings to engineering department for the approval.
Prepara all the reports for the upload in the PCOS (Project Completion System)
Monitoring of each project documentation for new changes is agreed with the customer in order to transfer this to our employee in time for our employees to use the latest version.
I coordinate the computer operator and quality officer
PROJECT ARCTIC LNG 2
The project includes the construction of three LNG trains, with a capacity of 6.6 mtpa of LNG each, and at least 1.6 mtpa of stable gas condensate. The total LNG capacity of the three trains will be 19.8 mtpa. The project employs an innovative construction concept using gravity-based structures (GBS). OOO Arctic LNG 2 is the operator and owner of all the assets.
The Utrenneye field is the resource base for Arctic LNG 2. The field is located in the Gydan Peninsula in YNAO approximately 70 km across the Ob Bay from Yamal LNG.
In 2018, we completed the front-end engineering design (FEED) and started site preparation, construction of early phase power supply facilities, production wells drilling, and construction of the quayside.
The participants of Arctic LNG 2 approved a final investment decision (FID) for the project in September 2019. Capital expenditures to launch the project at full capacity is estimated at $21.3 billion equivalent.
The GBS design concept as well as extensive localization of equipment and materials manufacturing in Russia will allow to considerably decrease the CAPEX per ton of LNG produced under this project. This will ensure a low cost structure of products and maximum competitiveness across the LNG markets.
August 2016 — October 2019
3 years 3 months
Ersai LLC
Aktau, www.ersai.kz
Quality Officer NDT Laboratory
Project EPC-2, EPC-3 NCOC, FGP/WPMP-TCO
Collection and reviewed daily NDT reports from all testing methods; ensured accuracy and compliance with project standards.
Identified clerical and technical errors in reports; issued nonconformity reports (NCRs) and coordinated corrective actions.
Maintained organized filing systems (both digital and physical) for all quality documentation across divisions.
Initiated and tracked transmittals for client and certification department approval.
Controlled and monitored the document approval workflow with the client, ensuring timely submission and feedback.
Assisted in managing document workflows and distribution; supported traceability and archiving of QA/QC records.
Prepared QA/QC dossiers to meet milestone deadlines and handover requirements.
Coordinated all documents signed and approved documents to DropBox and their registration internal records in FMS.
Tracked production backlog and maintained up-to-date internal data management systems.
Created and verified electronic document templates; ensured document readiness before processing.
Set up and managed document control systems in compliance with project procedures and contractual obligations.
Ensured all team members had access to current documentation versions and revisions.
Corporate Issues
Support Quality Engineer to implement and improve of system of NDT as per GOST ISO/IEC 17025.
Internal audit.
Intra laboratory control.
Support Head of NDT and Quality Engineer during audit from government company NCA.
Future Growth Project:
The Future Growth Project (FGP) / Wellhead Pressure Management Project (WPMP) is an expansion of Company’s existing facilities located in Tengiz, at Western Kazakhstan. The FGP/WPMP project is applying a modular construction design with Pre-assembled (Process and Utility) Units, namely the PAUs, and Pre-assembled (Pipe) Racks, namely the PARs, which are collectively referred to as Modules. The Modules are to be fabricated and tested outside the Area of Operations and transported to Tengiz in the Area of Operations for their final installation and Hook-up.
December 2015 — July 2016
8 months
RENCO-KAT
Aktau, www.renco-kat.it
Quality Specialist and assistant Project Quality Manager
Providing comprehensive support to the immediate supervisor/coordinator in performing all tasks related to the correct design, maintenance, storage and tracking of quality control (QA/QC) documentation.
Daily collection of reports on various disciplines, checking their completeness, correctness and compliance with the established standards of the project.
Identification of discrepancies and errors in the documentation, analysis of the causes and taking the necessary measures to eliminate them together with the responsible departments.
Control of the process of preparation, approval and sending of documentation to the client, including tracking of all transmittals.
Support of the processes of proper filling of all records, forms and reports of QA/QC, their systematization and timely updating.
Preparation of a quality control dossier (QA dossiers) in accordance with the established deadlines and project requirements.
Monitoring of the production backlog and regular updating of internal quality management system records.
Development and implementation of electronic documentation templates, as well as checking incoming documents for completeness and compliance before further processing.
Creation and support of an effective document management planning system that ensures the availability of all project documentation
Reporting and preparation of analytical materials on the status of document flow.
EPC PROJECT AgipKCO – Agip Kazakhstan North Caspian Operating Company N.V.:
The Scope of Work includes detailed design, for EPC2, EPC3 and EPC4 Topside Production Manifold Modules, procurement of materials, fabrication, load-out and transportation of EPC2 and EPC3 Topside Production Manifold Modules (KASHAGAN Field).
Engineering, Procurement and Construction of n.4 Instrument Buildings. Detail design developed by Renco include Civil/Architectural Finishing Works and AC/electrical/instrumentation/F&G Systems. The concrete shell of the buildings has been calculated in order to be blast resistant, including external blast doors and dampers. The buildings have been designed for a classified area Zone 1 IIB T3 and hard environmental conditions (max ambient temperature +45°C / min ambient temperature -36°C). The scope of work included commissioning and start-up.
Skills
Skill proficiency levels
Driving experience
Own car
Driver's license category BHigher education (bachelor)
2015
Геология и разведка месторождений полезных ископаемых
Languages
Tests, examinations
2023
Lead Auditor
Bureau Veritas, PR328: QMS ISO 9001:2015
2022
Internal Audit
Quality Management Centr , ISO 9001-2015, 14001-2015, 45001-2018
2022
Implementation
Quality Management Centr , ISO 17025-2019
Citizenship, travel time to work
Citizenship: Kazakhstan
Permission to work: Kazakhstan
Desired travel time to work: Up to one hour