Candidate

Female, 51 year, born on 10 February 1974

Aktau, willing to relocate, not prepared for business trips

Lead Planning

Specializations:
  • Other

Employment: full time

Work schedule: full day, rotation based work

Work experience 28 years 1 month

June 2014currently
10 years 11 months
TengizChevroil
Operation Planning Coordinator
- Collection and analysis of data and the provision of accurate reports on sea and land transport on CaTRo project; - Compiling and issuing daily planning reports; - Interaction with Farnborough Logistics Ops to update the Garner system; - Development and implementation of planning tools; - Interaction with subcontractors in the field of planning, analysis, development, graphics schedule; - Preparation of shipping schedules for land and sea cargo; - Preparation of daily, weekly and prospective schedules and reports - Issuance of warnings in case of inconsistency of schedules and targets
June 2017January 2018
8 months
TengizChevroil
Field Engineer planning
- Project Schedule elaboration within Primavera (P6) and MC Project programs; - Establish Detailed Work Breakdown Structures (WBS) as well as Cost Breakdown Structure (CBS); - Issued schedule Layout (level 0-3) of the schedule for the being uploaded the system; - Control on engineering work execution; - Collection, calculation and updating man-hours data within the project; - project controls discipline of estimation, quantity surveying, scheduling, planning, controlling of costs & documents; - Weekly verification of the submitted date from the contractor Engineering Document Schedule Report (EDSR); - Development the Bulk Material Accounting Table; - Control on the areas of expertise - Control on construction works execution: Camps, Roads, COF (cargo of facility) on the site; - Prepare of progress reports including tables, graphs, resources histogram, S-curve, earned value (EV)/ cash flows; - Updated and issued the project schedule Lookahead and Dashboard
June 2014June 2017
3 years 1 month
TengizChevroil
Planning analyst
Project Schedule elaboration within Primavera (P6) and MC Project programs; - Establish Detailed Work Breakdown Structures (WBS) as well as Cost Breakdown Structure (CBS); - Issued schedule Layout (level 0-3) of the schedule for the being uploaded the system; - Control on engineering work execution; - Collection, calculation and updating man-hours data within the project; - project controls discipline of estimation, quantity surveying, scheduling, planning, controlling of costs & documents; - Weekly verification of the submitted date from the contractor Engineering Document Schedule Report (EDSR); - Control on the areas of expertise - Prepare of progress reports including tables, graphs, resources histogram, S-curve, earned value (EV)/ cash flows; - Updated and issued the project schedule Lookahead and Dashboard.
September 2010June 2014
3 years 10 months
Kazakh Institute of Oil and Gas JSC
Manager on project evaluation and review technique
- Project progress estimation - Functions execution as per Duties Regulations; - CTR elaboration; - Participation in Tender Proposal preparation; - Project Schedule elaboration within Primavera and MC Project programs; - Monitoring of design/survey activities conduction; - Progressed work progress control tables; - S-curves formation, Work progress calculation; - Drawings transmittal control and tracking; - Required documents preparation for meetings between Client and Contractor; - Participation in Project Weekly Report preparation; - Consolidated Weekly Report preparation; - Control on project documents issue as per the Client’s requirements and standards
February 2009August 2010
1 year 7 months
ERSAI
Junior planning engineer
- Man-hours calculation and timesheets elaboration; - Project progress estimation; - Collection, calculation and updating of data on man-hours within the project; - Preparation of calendar schedule and network diagram on construction; - Control on construction works execution; - Weekly/Monthly Reports elaboration; - Preparation of List of equipment and materials for approval and final invoice closing with the Client.
July 2004February 2009
4 years 8 months
NIPI Caspian Engineering &Research
Senior Engineer of Project Services Group
- Timesheets elaboration on the projects as follows: “ Karakuduk Field. Associated Gas Utilization”, “ Associated Oil Gas Preparation within Dunga Field” and “ Provision of Consulting and Engineering Services on project documentation of the 4-th line of stabilization and cleaning-up at Karachaganak Field”; - Preparation of Network diagram on project execution in Microsoft Project; - Correspondence conduction with the Client; Preparation of Network diagram on project execution in Microsoft Project; - Complex research conduction on procurement and delivering; - Work execution plan calculation on complete set and construction (Reservoir Pressure Maintenance System (RPMS), Fuel Gas Treatment Unit (FGTU), and Central Oil Processing Station (COPS)), as well as monitoring of work implementation; - S-curves formation on sub-projects; - Collection and processing of data received, report on logistics, construction, installation, commissioning preparation for further submission for the Client’s review; - Processing of data provided by the Subcontractors with percentage indication of work completion and further formation of weekly, monthly reports for the Client’s review; - Construction work conduction control; - Weekly/Monthly Reports elaboration
August 2000July 2004
4 years
Mangyshlak Atomic Energy Integrated Plant KazAtomProm BN-350
Engineer on Dosimetric control
- Control on radioactive security and protection adherence; - Radioactive control organization; - Project evaluation schedule preparation in Microsoft Project; - Calculation of radioactive substances emissions into the atmosphere, calculation of radioactive substances in the ground water.
April 1997August 2000
3 years 5 months
MAEK KazAtomProm BN-350
Analyst of the 4-th category on water and gas analysis
− chemical analysis conduction for identification of water and gas chemistry of reactor production

Skills

Skill proficiency levels
Работа с большим объемом информации
Делопроизводство
SAP
Primavera
MS Project
Garner
Project Planning
MS Visio
MS Excel
Construction Management
Engineering
Cost engineering
Базы данных
MS PowerPoint

Higher education

1991
Tomskiy Polytechnic University
FTF, «Plazma physics», physicist - engineer

Languages

RussianNative


EnglishB1 — Intermediate


Citizenship, travel time to work

Citizenship: Kazakhstan

Permission to work: Russia

Desired travel time to work: Doesn't matter