Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was online less than a week ago

Candidate

Male, 35 years, born on 14 January 1990

Not looking for a job

Almaty, willing to relocate (Aksay (Kazakhstan), Aktau, Aktobe, Almaty, Astana, Kyzylorda, Uralsk, Shymkent), prepared for business trips

The approximate area of the job search is specified

QA/QC Manager, Lead QA/QC Welding and Mechanical Inspector, QA/QC Civil Supervisor, QC CSA Engineer

Specializations:
  • Other

Employment: full time

Work schedule: full day, rotation based work

Work experience 11 years 6 months

January 2023currently
2 years 4 months
LLP Tenaz Management (GATE)

Atyrau, www.tenazmanagement.com

QA/QC Deputy Manager
Project. «Future growth Project/ Wellhead Pressure Management Project (FGP/WPMP) » Gathering System, BF &GF. Project. GAS HANDLING OPTIMIZATION-PLATFORM INJECTION EXPANSION PROJECT
May 2022January 2023
9 months
LLP Tenaz Management (GATE)

Atyrau, www.tenazmanagement.com

Lead QC ( Piping / Welding / Mechanical)
Project: Pipelines (PL - F22, HPHT) Major Part of experience was in the Wellhead Pressure Management Project (WPMP) which includes various high pressure pipelines fabrication and installation. Material Grade includes A182 F22, API 5 L X60, F60, CRA clad pipes, etc. Responsibility included incoming material control inspection of A182 F22, API 5 L X60, F60 pipes with relevant DN, PL, & PO. Physical inspection includes assessing visible defects, proper identification on the pipes, end cap provision, etc. and Preparation of inspection report for each DN. Witnessed and coordinated Pipeline fabrication and installation. Material Grade X-60 Grade with Thickness 55mm up to maximum. Welding Process used Automatic GTAW + PGTAW-Automatic + PGMAW-Automatic. Witnessed and coordinated Pipeline fabrication and installation. Material Grade A182 F22 Grade with Thickness 55mm up to maximum. Welding Process used Manual GTAW + Automatic GTAW Implementing quality control over welding processes including establishment of welding procedure qualifications, qualification of welders, control of welding consumables, surveillance of welding & NDE activity, monitoring welding KPIs and identifying corrective action to remedy poor performance. Conducting Flawless Quality training programs in conjunction with Contractor to eliminate common defects. Conducted welder performance qualification test (WPQT), as per qualified WPS accordance with approved project specifications & Standards. Participated underground Pipeline welding inspection in F22 & X60 material with different welding process. Conducted Inspection and testing during welding by verifying that the essential welding parameters are obeyed to as to ensure compliance to the approved welding procedures in different materials like F22, API 5 L X60,F60. Review of contractors Method statement & Inspection Test Plan for Field Joint Coating as per Project Specification Requirement for Approval. Coordination and Witnessing with Flange management team, Hydro testing and flushing team based on project system completion priority system as per project procedures. Ensure that inspection records are maintained in a database that is aligned with completions management system to ensure a smooth handover to commissioning. Active involvement in pipeline Hydro Test process with high pressure at 750 Bar. This includes Flushing, Cleaning / Gauging, Water Filling, Pressure Testing, ILI (Inline inspection), Post Test inspection, Dewatering, Air Drying inspection & dew point verification. Nitrogen Purging inspection of the tested pipelines as a part of Pre-Commissioning support. Active involvement in pipeline Thermal Test process under service temperature. This includes Water Filling, Hot ILI (Inline inspection), Post Test inspection, Dewatering, Air Drying inspection & dew point verification. Nitrogen Purging inspection of the tested pipelines as a part of Pre-Commissioning support. Witness of Final Golden Welds and acquire Mechanical test Completion Certificate. Prepared and reviewed the project closeout dossier documents and submitted them to MC Plus
February 2021May 2022
1 year 4 months
LLP Tenaz Management (GATE)

Atyrau, www.tenazmanagement.com

Lead QC ( Piping / Welding / Mechanical)
Project: FGP/WPMP/ “Future growth Project/ Wellhead Pressure Management Project (FGP/WPMP)” Gathering System, BF &GF - Organization of inspections and delivery of all stages of work to customer representatives. - Ensuring the quality of construction and installation works Checking all stages of work. Operational control over the assembly and welding of welded joints - the implementation of technical preparation for the implementation of welding work, aimed at ensuring the high quality of welded products. - participation in the development of technological maps for assembly and welding. - Participation in personnel appraisal. Hydraulic and pneumatic tests, Bolt tightening Category A.B.C.D. Pump inspection and commissioning.
May 2019February 2021
1 year 10 months
LLP Tenaz Management (GATE)

Atyrau, www.tenazmanagement.com

Construction, Real Estate, Architecture... Show more

QC Supervisor (NDT)
- Ensure the fulfillment of tasks to improve the quality of products, work performed, monitor the activities of the enterprise's divisions to ensure the compliance of work. - Participate in the development, improvement and implementation of the quality management system, the creation of standards and quality indicators, monitor their compliance. - Analyze the information obtained at various stages of production work, quality indicators characterizing the work, and take measures to prevent the release of products, the production of work that does not meet the established requirements. - Consider and analyze complaints about the quality of products, prepare conclusions and correspond with the results of their consideration. - To study the causes of deterioration in product quality, release of defects, participate in the development and implementation of measures to eliminate them. - Prepare conclusions on the conformity of the quality of materials supplied to the enterprise, components, standards, specifications, as well as prepare documents for filing claims with suppliers. - Take part in the creation of enterprise standards for quality management, product preparation and certification, certification, in the preparation of measures for the implementation of standards and technical conditions for manufactured products, as well as in the development - To participate in the development of methods and instructions for the current quality control of work in the process of manufacturing products, in testing finished products and drawing up documents certifying their quality. - To develop and organize the implementation of measures based on the results of state supervision, interdepartmental and non-departmental control over the implementation and compliance with standards and technical conditions for product quality, preparation of products for certification and attestation. - Maintain records and prepare reports on the activities of the enterprise for product quality management.
June 2017May 2019
2 years
Bureau Veritas Kazakhstan

Atyrau, www.bureauveritas.kz

Business Services... Show more

Quality control engineer
- ensuring the implementation of tasks to improve the quality of the work performed - control over the activities of contracting and subcontracting companies to ensure compliance of the work carried out under international standards and GOST - prevention of output, production of works that do not meet the established requirements - analysis of claims and complaints about the quality of work - preparation of a conclusion on the compliance of the quality of the raw materials and materials received by the enterprise with the standards, technical conditions and paperwork for submitting claims to suppliers in case of non-compliance - development and organization of implementation of measures based on the results of state supervision, interdepartmental and non-departmental control over the implementation and compliance with standards and technical conditions - quality control of magnetic powder testing of welds - testing of materials and welds for hardness - quality control of laboratory tests of inert materials, bitumen, emulsion, seals, paints and asphalt - preparation of daily, weekly and monthly reports on the work done by subcontractors Participation in such projects as: - construction of residential complexes "Athletic Village" - the customer is Basis-A. Almaty city - overhaul of the runway of the Almaty International Airport - joint participation with GATE (GATE Inshaat) in the construction of FGP WPMP in Atyrau
October 2014May 2017
2 years 8 months
ABK-Laboratory LLP

Astana, www.abk-laboratoriya.kz

Construction, Real Estate, Architecture... Show more

Laboratory technician
- testing of building materials such as: reinforced concrete structures, bricks, mineral wool, foam plastic, cement, inert materials, soils, etc. - registration of results of analyzes and tests, their accounting, preparation of technical documentation for the work performed by the laboratory - performance of tests to determine the basic properties of materials in accordance with the requirements of standards and technical conditions - acceptance of technological samples and samples for analysis and testing - timely notification of relevant departments of the enterprise on the results of analyzes and tests - implementation of preparatory operations for particularly complex laboratory work - monitoring the operational condition of installations, instruments, tools and other laboratory equipment, performing its simple adjustment and making the necessary corrections to the technical documentation in accordance with the obtained results of analyzes and tests - preparation of calculations for the expenditure of funds for testing - reporting on a daily basis on the work done. Carried out strict quality control and compliance of materials according to GOST standards. Taking full responsibility for the results of control. Participation in the construction of such large and international projects as: - EXPO-2017 - Balkhash Thermal Power Plant, customer - Samsung - Construction of the highway Astana-Pavlodar
September 2011July 2012
11 months
State institution "Secondary school named after P. Dutov"

Almaty

Educational Institutions... Show more

Head teacher
- Methods of finding and supporting young talents. - Conducting an event, developing a script. - Control open lessons.

Skills

Skill proficiency levels
MS Office
NDT test
Quality Control
SNiP standards
Spectral analysis

Driving experience

Own car

Driver's license category B, C

About me

Non-Destructive Visual-Measurement Control 2 level Non-Destructive Testing 2 level (RT, MT, PT) Qualification certificate of welding engineer Certificate of TCO course “Safe Excavation Practices” Certificate of TCO course “Working at Heights” Certificate of TCO course “Confined Space Entry Certificate of industrial safety TCO. Badge-14903147

Higher education (master)

2014
Institute of High Technology Physics, Electronics-Nanoelectronics
2011
Physics and Mathematics, Professional education

Languages

KazakhNative


EnglishB1 — Intermediate


RussianC2 — Proficiency


TurkishB1 — Intermediate


Tests, examinations

2024
Non-Destructive Testing
LLP "Batys Ondyrys-Kurylys Service", Non-Destructive Testing (VT)
2024
Specialist In Welding Production
LLP "Кран Сервис ЛТД" , Welding Engineer
2022
Non-Destructive Testing
LLP "Теңіз арыстаны", Non-Destructive Testing Specialist (RT, MT, PT)
2018
Spectral analysis of materials
LLP "CCS Services-Central Asia" , Admission to work with portable X-ray fluorescence spectrometer Niton XL2-980 for the analysis of mining and geological samples

Citizenship, travel time to work

Citizenship: Kazakhstan

Permission to work: Kazakhstan

Desired travel time to work: Doesn't matter