Больше информации по резюме будет доступно после регистрации
ЗарегистрироватьсяWas online more than two weeks ago
Candidate
Male, 39 years, born on 30 April 1985
Not looking for a job
Aktau, willing to relocate, prepared for business trips
Maintenance Manager
1 600 000 ₸ in hand
Specializations:
- Other
Employment: full time, project work
Work schedule: full day, shift schedule, remote working, rotation based work
Work experience 16 years 2 months
July 2023 — currently
1 year 10 months
ITR Services LLP
Aktau, itrs.kz/
Project Manager
- Based on SoW develop Quotation Proposal
- Plan all phases of the construction lifecycle from initiation to
completion
- Ensure to the execution team all necessary regulations and
permits
- Ensure necessary supplies, tools, and equipment
- Plan all construction operations and schedule intermediate phases to ensure deadlines will be met
- Evaluate progress and prepare detailed reports
- Ensure adherence to all health and safety standards and report issues
- Ensure Wellhead Maintenance properly running
September 2021 — June 2023
1 year 10 months
Verus Project Management LLP
Astana
IT, System Integration, Internet... Show more
Project Manager
Ensure expected high quality Project delivery in initially agreed timeframe as per worldwide good practices on Pavlodar Refinery:
1) Maitenance and Reliability Business Process (MRBP) design
2) Design, Implementation, Test and Roll-out new functionalities and Interfaces as per new MRBP into the Company's ERP and CMMS systems
3) Define and Implement KPIs, required reports and Dashboards
4) Define and Implement Criticality Assessment process
5) Define and Implement Plant Maintenance development Methodology for exising CMMS system
6) Define and Implement BoM development Methodology for existing CMMS system
7) Define and Implement integration of existing ERP and CMMS systems for Maintenance related procurement process
Achievement:
The project was successfully executed within the designated timeframe, meeting all deliverables and objectives
July 2021 — September 2021
3 months
Total E&P Dunga
Aktau
Oil and Gas... Show more
Asset Improvement Methods Lead
Duties:
1) Turnaround (TAR) coordinator
2) SME and TA in Asset Data Register and Maintenance Build
3) Reliability Lead
4) Asset interface efficiency improvement Lead
Achievement:
Prepared full package of Turnaround (Full field shutdown) on Dunga field within 2.5 month which was included but not limited:
1) Gantt chart of main works
2) Budget for maintenance and project works,
3) Justified and aligned with Top Management start and end day,
4) Check list of whole resources readiness
August 2019 — August 2021
2 years 1 month
Total E&P Dunga
Aktau
Oil and Gas... Show more
IPMAR Project Team Lead
Leading a Project team for Improvement Plant Maintenance Asset Register in SAP, by building robust backbone for future RCM implementation:
• develop new Hierarchy (based in ISO 14224) of Asset Register specific for Dunga facility
• facilitate criticality assessment to define and focus on core safety and production affected equipment
• develop proper maintenance Philosophy and maintenance Strategy and based on it build the Catalog Profile, Maintenance Task List, Maintenance Plans.
June 2018 — August 2021
3 years 3 months
Total E&P
Aktau
IRM Engineering Team Lead
Duties: Lead an Integrated, Reliability and Maintenance (IRM) team. Prepare for turnarounds, perform Root Cause Analysis (RCA), update maintenance strategies, and update preventive maintenance schedules in the Computerized Maintenance Management System (SAP). Ensure major call-off contracts are executed, and provide timely reviews of project deliveries for as-built documentation.
Achievements:
1) Improved IRM team efficiency by decreasing external “ad-hocs”
2) Optimized OPEX budget for maintenance on 35%
3) Optimized purchase process for critical and consumable materials
March 2018 — June 2018
4 months
Total S.A.
Aktau, www.total.com/
Control and instrumentation engineer - Substitute of IRM Team Lead
I’ve substituted the Lead of IRM Team in Dunga Asset department. My responsibilities are annually provide high level of SoW for planned full field shutdown by all maintenance disciplines. Ensure proper RCA in place for each single troubleshooting activities. Ensure all related Maintenance Strategies in place and updated. Ensure proper PPM (task lists, maintenance items, maintenance plans) are in the CMMS system (SAP). Ensure Major call-off contracts in place as well as an Outline Agreements for spares are in place. Timely provide review Project delivery's for as-built docs.
January 2017 — June 2018
1 year 6 months
Chemical Production, Fertilizers... Show more
Control System Engineer
Department: Integrity, Reliability and Maintenance
Responsibilities:
Ensure ESD-F&G-PCS systems and equipment integrity and reliability by properly scheduled and tasks exhaustively described in planned preventive maintenance (PPM).
Ensure quality and actuality of task list for PPMs.
Ensure proper certified contractor in place.
Ensure suitable contract management plan (CMP) per contract.
Ensure timely troubleshooting and further root cause analyses (RCA) reports. Initiate and follow up facility modification proposals (FMP) through the MoC process.
Ensure best practice solutions are implemented in situ. Support commissioning team on mechanical completion stage to define noncompliance with Regulations and Company standard requirements.
Develop for Production Critical Equipment rlated critical BoMs with further defined MRP settings for stock reordering process.
September 2014 — September 2017
3 years 1 month
Chemical Production, Fertilizers... Show more
Instrumentation Engineer
Department: Maintenance
developed within the MX project
Achievements:
1) Identified all potential gaps (initial design issues, bottlenecks of combined different projects and etc.) in ESD/F&G/PCS systems
2) Relevant missed PPMs have been developed within the MX project
3) For SCE relevant Contractors have been nominated with precise and efficient developed CMP
4) Identified poor safety and reliability of process control and 25 FMPs have been initiated and processed jointly with Engineering team within 2 years
5) Vast amount of gaps been identified during walkdown on new constructed facilities before commissioning process.
Responsibilities: Ensure ESD-F&G-PCS systems and equipment integrity and reliability by properly scheduled and tasks exhaustively described in planned preventive maintenance (PPM). Ensure on all safety critical elements (SCE) proper certified contractor in place. Ensure suitable contract management plan (CMP) per contract. Ensure timely troubleshooting and further root cause analyses (RCA) reports. Initiate and follow up facility modification proposals (FMP). Carry out proactive work to implement maintenance excellence (MX). Ensure best practice solutions are implemented in situ. Support commissioning team on mechanical completion stage to define noncompliance with Regulations and Company standard requirements.
developed within the MX project
January 2014 — September 2014
9 months
Maersk Ole og Gas A/S
MITAS Jr. I&C Engineer
Department: I&C Engineering
Responsibilities: Lead small projects as Facility Modification Proposals. Develop Alarm Management system.
Achievements:
* Identified and implemented Instrumentations to be able monitor and analyze speed of erosion on the knee of the pipe on the oil production wellhead. ;
* Upgraded logic philosophy of reporting data from Alarm Management system
May 2013 — December 2013
8 months
Maersk Oil UK North Sea Ltd.
MITAS Jr. I&C Engineer
Department: Engineering & Project
Responsibilities: Develop the concept and implement the Valve Monitoring System for all UK BU assets. Timely troubleshooting support to the offshore team by the technical and process issues.
Achievements:
ESDVs/BDVs monitoring and analyzing system has been developed and implemented and relevant training to the assets personnel has been held
September 2012 — May 2013
9 months
Maersk Oil Kazakhstan Gmbh
MITAS Jr. Instrumentation Engineer
Department: Maintenance
Responsibilities: Arrange all required maintenance works during periodic shutdowns on onshore oil field. Ensure the required instrumentation and control system equipment. Ensure timely support to engineering team with developing projects. Develop the Safety Stock of I&C equipment in SAP system.
Achievements:
* Identified poor safety and reliability of process control and FMP has been initiated and processed jointly with Engineering team within 8 Month ;
* Developed list of PCS equipment and implemented to the SAP with further ensuring equipment into the stock.
June 2011 — September 2012
1 year 4 months
Maersk Oil Kazakhstan Gmbh
Instrumentation Technician
Responsibilities: Maintenance, repair and configuration of instrumentation such as Foxboro (pressure transmitters, displacer level transmitters, DP transmitters), Rosemount (pressure transmitters), Krohne (Radar level transmitters), Wika (pressure switches) etc.
Aibar Tolebayev
Address: Aktau, Kazakhstan
Mobile: +7-777-7571025
E-mail: tolebayev.aibar @ - mailto:tolebayev_A_X@mail.ru g mail - . - com
May 2009 — June 2011
2 years 2 months
Mangistauenergomunai LLP
Instrumentation Engineer
Responsibilities: Maintenance of Gas Turbine Power Station control system based on SIEMENS Simatic S7-300 / S7-400 PLC and WinCC SCADA.
March 2009 — May 2009
3 months
Munaitelecom LLP
Instrumentation Technician
Responsibilities: Maintenance and repair of instrumentation.
Languages
Russian - fluent
Kazakh - native ,
Skills
Skill proficiency levels
Driving experience
Own car
Driver's license category BAbout me
Experienced leader, strategic planner and networking professional
with a strong background in Integrity, Reliability and Maintenance
(IRM) Engineering. Leverages background in project management
and budget control to achieve operational targets. Outstanding
managerial abilities with proven success recruiting and training
talented teams. Responsible team lead, passionate about delivering
outstanding quality and service. Offering 12 years of experience in
industry with history of recognition for performance.
Higher education
2009
Moscow State Technology University
Механика и Управление, Qualification: Engineer
Languages
Professional development, courses
2014
Process Safety Engineering – PS-4
PetroSkills , Process Engineering
2014
Applied Water Technology in Oil & Gas Production – PF – 21
PetroSkills , Process Engineering
2014
Professional development within the Maersk International Technology and Science (MITAS) Program
Maersk Oil , Facilities Engineering
2012
Oil Production & Processing Facilities – PF-4
PetroSkills, Process Engineering
Citizenship, travel time to work
Citizenship: Kazakhstan
Permission to work: Kazakhstan